You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  2. DEVELOPMENT OF A DIFFERENTIAL GPS NAVIGATION FILTER WITH AUTONOMOUS FAILURE DETECTION

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  3. High Resolution Data Sources and Applications for Transportation Planning

    SBC: Shenandoah Mountain            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  4. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  5. LASER RADAR MEASUREMENT SYSTEM FOR ROADSIDE ENCROACHMENT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  6. Microwave NDT of Cracks in Structural Metals

    SBC: Raymond & Lae Engineering,            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  7. THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"

    SBC: Intellicorp            Topic: N/A

    COORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...

    SBIR Phase I 1990 Department of Transportation
  8. Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device

    SBC: EYEGAZE INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government