You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Feasibility Study of an Internet-Based GUI for Highway Capacity Software
SBC: Viggen Corp.on Topic: N/AIn this proposal, the Viggen Project Team presents an elegant approach to developing a truly portable Graphical User Interface (GUI) for the Highway Capacity Software (HCS). Our approach is based on the emerging Internet-driven computing technology and will be totally platform-independent. The prototype will be developed using a programming language called Java and users will be able to execute ...
SBIR Phase II 1997 Department of Transportation -
High Resolution Data Sources and Applications for Transportation Planning
SBC: Shenandoah Mountain Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Microwave NDT of Cracks in Structural Metals
SBC: Raymond & Lae Engineering, Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device
SBC: LC TECHNOLOGIES, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AThe research is to develop a sheet flow sampler to collect highway washoff and to operate in a highway roadside environment. The proposed sampler is expendable, simple, and cost effective. It will collect a predetermined depth of runoff (most commonly the first 1/2 inch of "first flush"), store it, and be removed and replaced by maintenance workers following rain events. The sampler will be its ...
SBIR Phase II 1997 Department of Transportation