You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Aerosol Particle Spectrometer with Depolarization and Fluorescence (APSDF)

    SBC: Droplet Measurement Technologies, LLC            Topic: 822

    jj

    SBIR Phase I 2010 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Field Rail Welding with the Electroslag Welding Process

    SBC: EST&D LLC            Topic: 101FR5

    The two most frequently used field rail welding processes, thermite and flash-butt, have limitations. The thermite process, though less expensive and more portable, sometimes produces welds with inclusions which can limit short term quality and long term fatigue life. Flash-butt, which produces a very high quality weld, is not as portable as thermite. SBIR solicitation 10.1 FR5 requires a new w ...

    SBIR Phase I 2010 Department of Transportation
  3. LifeWorks: Development of an Integrated Suite of Life Management Tools for Individuals with Disabilities and Caregivers

    SBC: ASSISTECH SYSTEMS LLC            Topic: N/A

    This project develops and evaluates the feasibility of a client-server application that integrates accessible life management tools for individuals with disabilities and those who support them in residential environments to improve the independent living capacity of persons with cognitive disabilities. A common database of information about an individual’s life and needs is developed providing r ...

    SBIR Phase I 2010 Department of Education
  4. My Academic Plan

    SBC: SHW Enterprises            Topic: N/A

    My Academic Plan will be a web-based social-behavioral formative assessment intervention for eighth grade students. Students will take an initial online resiliency quiz and based on the responses the software will produce a personal plan across a series of dimensions. The intervention will be during class and will provide individualized tutorials. The intervention will include teacher professional ...

    SBIR Phase I 2010 Department of Education
  5. Transportation Vehicle Waste Heat Recovery System

    SBC: MMPG LLC            Topic: 101FT1

    A one-cylinder diesel engine will be modified to achieve a 20% to 40% improvement in fuel efficiency. This will be accomplished by insulating the interior of the combustion chamber with a proprietary thermal insulating material. Heat normally transferred to the engine coolant through the walls of the head, cylinder and piston will be retained within the combustion chamber where it is available t ...

    SBIR Phase I 2010 Department of Transportation
US Flag An Official Website of the United States Government