You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Very High Speed Third Rail Insulator Cleaning

    SBC: MINI, LLC            Topic: 07FT4

    This Phase IIB proposal will accelerate the commercialization of the Phase II project that developed the Vohrtex insulator cleaner. The Phase II cleaner used self-spinning nozzles which require oversized offset jets to provide sufficient reaction force to make the nozzle spin. The oversized jets damage the surface finish of the insulators. This Phase IIB project will use small pneumatic, electric ...

    SBIR Phase II 2013 Department of Transportation
  2. Low Cost Bridge Structural Monitoring Technology / Turning Structural Monitoring Data into Decision Making Information

    SBC: Intelligent Automation, Inc.            Topic: 081FH6

    This is a supplemental Phase II proposal submitted to DOT for additional funding and performance period extension of the on-going DOT Phase II project (contract # DTRT57-10-C-10027). The overall objective of the Supplemental Phase II effort is to complete the development of the sensor system capable of continuously monitoring the integrity of bridge structures, conduct field operation validation ...

    SBIR Phase II 2013 Department of Transportation
  3. Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit

    SBC: Intelligent Automation, Inc.            Topic: 121FM1

    Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside inspection, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their sequences attached to the powered unit. An automated trailer VIN id ...

    SBIR Phase II 2013 Department of Transportation
  4. Climate Impact Visualization Tools Using Virtual 3D City for Community Based Planning and Outreach

    SBC: Intelligent Automation, Inc.            Topic: 931RC

    Intelligent Automation, Inc. proposes an innovative visualization tool that transforms online GIS mappers into a climate impact assessment and planning tool that allows planners to visualize the impact of storm surges with sea level rise and coastal erosion using a 3D virtual city. The goal is to assist planners and emergency services to adapt to climate change at three tiers: i) Tier 3 (Long-te ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Low Ground Clearance Vehicle Detection and Warning System

    SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION            Topic: 131FR1

    Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...

    SBIR Phase I 2013 Department of Transportation
  7. Low Ground Clearance Vehicle Detection and Warning System

    SBC: Intelligent Automation, Inc.            Topic: 131FR1

    The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...

    SBIR Phase I 2013 Department of Transportation
  8. Creating Spatial Disorientation in Flight Simulation

    SBC: CONTINUUM DYNAMICS INC            Topic: 122FA1

    Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...

    SBIR Phase I 2013 Department of Transportation
US Flag An Official Website of the United States Government