You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. OBJECTIVE ANALYSIS OF OCEANIC DATA FOR COAST GUARD TRAJECTORY MODELS

    SBC: APPLIED MATHEMATICS, INC.            Topic: N/A

    THE COAST GUARD USED VELOCITY FIELDS FROM VARIOUS OCEAN CIRCULATION MODELS TO PROVIDE INPUT INTO TRAJECTORY MODELS WHICH ARE USED IN SEARCH PLANNING TO DETERMINE SEARCH AREA MOVEMENT. STATISTICAL TECHNIQUES (CALLED OBJECTIVE ANALYSIS), WHICH ARE APPLICATIONS OF THE GAUSS-MARKOV THEOREM, ARE USED BY THE OCEANOGRAPHIC MODELING COMMUNITY TO COMBINE OBSERVATION DATA WITH DYNAMICAL MODELS TO PROVIDE AC ...

    SBIR Phase II 1994 Department of Transportation
  2. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  3. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. COMPREHENSIVE INTRMODAL FREIGHT TRANSPORTATION VISUAL DATABASE

    SBC: Reebie Associates            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
US Flag An Official Website of the United States Government