You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Noise, InGaAs Dual Photodiodes for Precise Timing

    SBC: DISCOVERY SEMICONDUCTORS, INC.            Topic: N/A

    Conversion of highly stable optical clocks into electrical clocks through photodetection introduces excess phase noise and degrades the frequency stability by two to three orders of magnitude.

    SBIR Phase I 2008 Department of CommerceNational Institute of Standards and Technology
  2. Reducing Traffic Pressure During Hazmat Incidents By Utilizing Situation Awareness Capabilities

    SBC: Drakontas LLC            Topic: N/A

    This proposal responds to DOT topic 081-PH2 "Hazardous Materials (Using Handheld Devices to Assist in Emergency Response to Hazardous Materials Incidents)." The significant innovation in this project involves extending cutting edge tools developed to enhance situation awareness among first responders with appropriate hazmat and traffic information to create a framework for interperting traffic re ...

    SBIR Phase I 2008 Department of Transportation
  3. Locking Mechanism for Rotating Seats

    SBC: Kustom Seating Unlimited Inc. (KSU)            Topic: 07FR1

    Research is proposed to develop a locking mechanism for intercity (Amtrak) rotating seats that can be retro-fit to existing seats. Current intercity rail seats, according to the National Transportation Safety Board (NTSB), present a safety hazard to the riding public. Post accident investigations show that passenger rail seats were found to have been uncontrollably rotated even though current se ...

    SBIR Phase I 2008 Department of Transportation
  4. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government