You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Motor Vehical Crash Costing Technology

    SBC: ARCCA, INC.            Topic: N/A

    With the advent of widely available PC technology, crash safety information can be cost-effectively disseminated to millions of people in an engaging and educational way. With an enticing and informative PC application, data about damages, costs, injuries and death can be personalized and grasped by anyone, particularily young drivers developing new driving behaviors. ARCCA's proposed system wil ...

    SBIR Phase I 1996 Department of Transportation
  2. "Safety Seat and Restraint System"

    SBC: ARCCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  3. DEMONSTRATING THE PROFITABILITY OF LINKING PRIVATE DEVELOPMENT USING THE HORIZONTAL DEVELOPMENT PROCESS (HOP) TO PROVIDE FREE INCREMENTS OF TRANSIT FOR THE PUBLIC.

    SBC: Cityscope & Mobility Co            Topic: N/A

    PRIVATE INVESTMENTS IN TRANSPORTATION CAN BE PROFITABLE. THE HORIZONTAL DEVELOPMENT PROCESS (HDP), EMPLOYING A SPECIALIZED FORM OF PEOPLE-MOVER AS A HORIZONTAL ELEVATOR (H*E), MAXIMIZES THE DEVELOPMENT POTENTIAL, REDUCES THE RISK OF HIGH COSTS OR LOW INVESTMENT RETURN. AN HDP GUIDE WITH INDEPENDENT FINANCIAL APPRAISALS INCLUDING PROFORMA DATA AND PRELIMINARY UTAG (URBAN TRANSPORTATION ACTION GRANT ...

    SBIR Phase I 1987 Department of Transportation
  4. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  5. High-Speed Dynamic 3D Surface Mapping System

    SBC: Conrad Technologies, Inc.            Topic: N/A

    Conrad Technologies, Inc. (CTI) proposes a non-contact, dynamic 3D position sensor based on optical triangulation using multiple radiating LED targets to measure intrusion of an automobile structure into the occupant compartment during full-scale crash tests. CTI has significant experience developing non-contact measurement instruments. CTI has developed a Motion Imaging and Tracking Acquisition ...

    SBIR Phase I 2002 Department of Transportation
  6. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase I 2001 Department of Transportation
  7. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  8. Innovative Multi-Celluar Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  9. FABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS.

    SBC: The Cumagna Corpon            Topic: N/A

    FABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS. THESE ELEMENTS ARE EXPECTEDTO BE EXTREMELY STRONG, ONE-FOURTH THE DENSITY OF STEEL, ANDTO PERMIT CONSIDERABLE SAVINGS IN THE COST OF ERECTION, MAINTENANCE, AND REPLACEMENT OF BRIDGES, ETC. PHASE I WILL PRODUCE, TEST, AND ANALYZE I-BEAMS FABRICATED FROM SEVERAL MAGNAWEAVE CONSTRUCTIONS (WEAVE GEOMETRIES); TH ...

    SBIR Phase I 1983 Department of Transportation
  10. INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEM SIMULATION- IEMS(3)

    SBC: Data Communications Corp.            Topic: N/A

    THE PURPOSE OF THIS RESEARCH PROJECT IS TO DETERMINE THE FEASIBILITY OF MERGING AN EMERGENCY MEDICAL SERVICES (EMS) SIMULATOR WITH GEOGRAPHICAL INFORMATION SYSTEMS (GIS) IN ORDER TO PRODUCE IEMS(3) (INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEMS SIMULATOR), A PC-BASED SYSTEM WHICH CAN BE USED FOR BOTH ADDRESSING STRATEGIC PLANNING ISSUES OF EMS SYSTEMS (E.G., SYSTEM CONFIGURATION; VEHICLE LOCATION ...

    SBIR Phase I 1994 Department of Transportation
US Flag An Official Website of the United States Government