You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Continuous and Automated Manufacturing Breakthrough, Securing a Robust Domestic Supply Chain of Affordable High Temperature Reinforcement for Hypersonic Thermal Protection System Applications

    SBC: Bally Ribbon Mills            Topic: DLA231D07

    The loom developed by the BRM team is the most advanced and versatile loom ever built by BRM. The servo control of all movements in the weaving operation, combined with BRM’s experience of weaving novel structures is a true game changer, advancing BRM’s ability to supply woven preforms which were unobtainable until now. Now that the loom is built and a proof of concept has been woven on the lo ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. Automation of Aluminum Powder Transport and Packout

    SBC: Ampal Inc.            Topic: DLA232D07

    Automating the transfer of nodular aluminum powder within a plant by using compressors or blowers can bring several benefits: Increased Efficiency: Automation will eliminate the need for manual labor, reducing the time and effort required for powder transfer. Compressors or blowers will move the powder quickly and consistently, improving overall efficiency. Cost Savings: By replacing manual labor ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. DeVal LCS Response to DLA232-001 NSN 5210-01-519-1548

    SBC: DeVal Life Cycle Support, LLC            Topic: DLA232001

    DeVal Life Cycle Support, LLC is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for NSN 5210-01-519-1548 – Box, Adapter.​​​​​​​ DeVal Life Cycle Support, LLC will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The in ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Domestic Needled Preforms for C/SiC Composites

    SBC: MATERIALS RESEARCH & DESIGN INC            Topic: DLA231D07

    Standard Missile 3 (SM-3) employs a divert and attitude control system (DACS) to guide the kinetic weapon (KW) in a hit-to-kill maneuver.  The DACS motors employ C/SiC composite throats and pintles to control the hot gas thrust and thereby guide the KW during the final maneuver.  Existing DACS hardware are made using needled carbon fiber preforms purchased from France.  The supplier has decided ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains

    SBC: COMPASS SYSTEMS, INC.            Topic: DLA231001

    Compass Systems Inc. has extensive design and manufacturing expertise in the Cable Harness industry.  Our team of engineers and manufacturing technicians are well suited to support the technical review of fragmented/incomplete documentation, system inspection (if required), TDP generation, and the SAR submission for NSN 615013643908.  Compass Systems Inc. also possess extensive past performance ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  10. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...