You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Innovative Multi-Celluar Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Geographic Information System-Based Computer Assisted Interviewing Software
SBC: GeoSystems Global Corp. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Conceptual Design of a 'Tri-Coupler' System
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase II 1998 Department of Transportation -
Highly Tunable Transmission Control Protocol/Internet
SBC: ARCHITECTURE TECHNOLOGY INC Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation