You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
Displaying 4 result(s)
-
N/A
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase I 2000 Department of Transportation -
N/A
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase II 2000 Department of Transportation -
FABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS.
SBC: The Cumagna Corpon Topic: N/AFABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS. THESE ELEMENTS ARE EXPECTEDTO BE EXTREMELY STRONG, ONE-FOURTH THE DENSITY OF STEEL, ANDTO PERMIT CONSIDERABLE SAVINGS IN THE COST OF ERECTION, MAINTENANCE, AND REPLACEMENT OF BRIDGES, ETC. PHASE I WILL PRODUCE, TEST, AND ANALYZE I-BEAMS FABRICATED FROM SEVERAL MAGNAWEAVE CONSTRUCTIONS (WEAVE GEOMETRIES); TH ...
SBIR Phase I 1983 Department of Transportation -
RADAR TRAFFIC MONITOR FOR INTERSECTION TRAFFIC MANAGEMENT
SBC: Epsilon Lambda Electronics Corp. Topic: N/AN/A
SBIR Phase I 1983 Department of Transportation