You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
Displaying 4 result(s)
-
N/A
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase I 2000 Department of Transportation -
N/A
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase II 2000 Department of Transportation -
SEAT BELT MANAGER FOR MIDSIZE CHILDREN
SBC: Hy Zelkowitz Design & Mike's Topic: N/AMIDSIZE CHILDREN (AGED 5-7) DO NOT PROPERLY FIT AVIALABLE ADULT SEAT BELT SYSTEMS AND OFTEN RESIST USING SCALED-UP TODDLER RESTRAINT SYSTEMS. OUR OBJECTIVE IS TO DEVELOP A SIMPLE LOW COST DEVICE TO REROUTE THE PATHWAYS OF THE STANDARD TWO AND THREE POINT BELT RESTRAINTS TO ACCOMMODATE THE SKELETAL SIZE OF THE MIDSIZE CHILD. THIS DEVICE WILL POSITION THE LAP BELT FORCES ACROSS THE ILIAC CREST TO PR ...
SBIR Phase I 1990 Department of Transportation -
IMPROVED AEROSOL CAN
SBC: Materials Engineering & Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation