You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation
  2. Viability of Crowd-Source Transit Information Systems

    SBC: View Update Media LLC            Topic: 121FT1

    The company is commercializing a mobile social computing system named Tiramisu (“pick me up” in Italian) that is intended to connect riders and transit service providers. It supports a variety of collaboration mechanisms designed to improve the experience of riders in a transit service and improve the service provided by service operators. The system has been designed using current knowledge i ...

    SBIR Phase I 2012 Department of Transportation
  3. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation policy making, work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations (Van Dongen et al. 2003; Mollicone et al. 2010). Our group was the first to document the considerable magn ...

    SBIR Phase II 2012 Department of Transportation
  4. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: N/A

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...

    SBIR Phase II 2004 Department of Transportation
  5. Low Cost Transverse Rail Defect Detector

    SBC: WavesinSolids LLC            Topic: N/A

    Development of the basic EMAT-based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstrable version of a 2-rail detection system with automated signal interpertation.

    SBIR Phase II 2004 Department of Transportation
  6. N/A

    SBC: Sharma & Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Transportation
  7. N/A

    SBC: Sharma & Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Transportation
US Flag An Official Website of the United States Government