You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. NEURAL NETWORK LANE CHANGE DETECTOR

    SBC: Exodyne Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1993 Department of Transportation
  2. INVESTIGATION OF STRUCTURAL ADHESIVES

    SBC: Texas Research Institute, Austin, Inc.            Topic: N/A

    THIS PROJECT IS DESIGNED TO FURNISH FHWA WITH A NUMBER OF IMPORTANT PRODUCTS IN PREPARATION FOR ACCELERATED LIFE TESTING (ALT) OF A LARGE SCALE MODEL JOINT AND A LONG TERM FULL SCALE BEAM TEST TO VERIFY THE ALT. THE MOST IMPORTANT PRODUCT IS A PROCEDURE FOR INTRODUCING DESIRED MOISTURE LEVELS INTO LARGE AREA BONDS IN A RELATIVELY SHORT TIME. A SECOND PRODUCT IS THE ALT PLAN WHICH ACCOUNTS FOR THE ...

    SBIR Phase II 1991 Department of Transportation
US Flag An Official Website of the United States Government