You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ADVANCED MATERIAL CONCEPTS FOR GUARDRAIL END TREATMENTS
SBC: United Dynamics, Inc. Topic: N/AGUARDRAIL TERMINALS ARE SOME OF THE MORE TROUBLESOME AND POTENTIALLY HAZARDOUS ROADSIDE APPURTENANCES. RECENTLY DEVELOPED TERMINAL CONCEPTS WHICH HAVE PASSED CURRENT CRASH TEST CRITERIA TEND TO BE EXPENSIVE AND MAY REQUIRE EXCESSIVE LENGTH OF NEED, FLARE-OUT SPACE AND ADDITIONAL FILL AND GRADING. THIS PHASE I SBIR PROPOSAL ADDRESSES THE DEVELOPMENT OF A MORE EFFICIENT ENERGY ABSORBING TERMINAL CON ...
SBIR Phase II 1994 Department of Transportation -
NEURAL NETWORK LANE CHANGE DETECTOR
SBC: Exodyne Technologies, Inc. Topic: N/AN/A
SBIR Phase II 1993 Department of Transportation -
NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION
SBC: Stress Eng Services, Inc Topic: N/AAVAILABLE NDT TECHNIQUES CAN DETECT RELATIVELY LARGE DEFECTS IN DRILLED SHAFTS. TO PROVIDE INFORMATION ABOUT THE SIZE OR SHAPE OF THE DEFECT, SOME TECHNIQUES REQUIRE EMBEDDING SENSORS INSIDE OF HAVING ACCESS ALONG THE LENGTH OF THE SHAFTS. SUCH REQUIREMENTS LIMIT THEIR APPLICABILITY TO NEWLY CONSTRUCTED SHAFTS AND ALSO COMPLICATE THE DESIGN AND INSTALLATION PROCESSES. IN THE STRESS WAVE APPROACH, ...
SBIR Phase II 1994 Department of Transportation