You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A GRAPHICALLY BASED FRONT-END APPLICATION FOR COMPUTATIONAL FLUID DYNAMICS ALGORITHMS

    SBC: AEROSOFT INC            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  2. A GENERALIZED COMPUTATIONAL FLUID DYNAMICS PACKAGE FOR ALL MACH NUMBERS

    SBC: AEROSOFT INC            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  3. VALIDATION OF FLIGHT-CRITICAL SYSTEMS BY AN AUTOMATIC TEST- PROCEDURE GENERATION TOOL

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  4. A NON-INTRUSIVE SOLID STATE ANGLE-OF-ATTACH INSTRUMENT

    SBC: ANALYTICAL SERVICES & MATERIALS INC            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  5. HIGH-RESOLUTION AUTOMATED METHOD FOR LOCATING, IDENTIFYING, AND MEASURING SURFACE

    SBC: Apd Cryogenics Inc.            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  6. IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE

    SBC: GINER INC            Topic: N/A

    FOR CATHODIC PROTECTION SYSTEMS TO BE SUCCESSFUL IN MITIGATING CORROSION WITHOUT CAUSING HYDROGEN EMBRITTLEMENT OF PRESTRESSING STEEL, THE AMOUNT OF POLARIZATION OF THE EMBEDDED STEEL MUST BE VERY ACCURATELY CONTROLLED. PRESENTLY AVAILABLE EMBEDDED REFERENCE ELECTRODES DO NOT HAVE THE LONG TERM STABILITY OR RELIABILITY RE@UIRED TO MONITOR AND CONTROL THE AMOUNT OF POLARIZATION WITH THE ACCURACY RE ...

    SBIR Phase II 1993 Department of Transportation
  7. NON-DISTURBING GAS FRACTION METER FOR TWO-PHASE FLOWS IN MICROGRAVITY

    SBC: THERMACORE, INC.            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  8. FLEXIBLE, LIGHTWEIGHT CIS/CDS SOLAR CELLS MANUFACTURED MONOLITHICALLY & INTERCONNECTED IN A ROLL-TO-ROLL PROCESS

    SBC: THERMACORE, INC.            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government