You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GaP ZnS for Blue Light Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    AstroPower is developing a two-junction monolithic tandem solar cell composed of (AlxGa1-x)0.51In.49P lattice matched to GaAs for use as the top cell in a three-junction, two-terminal tandem stack. This tunable bandgap material system is capable of current matching, at 2.03eV, in a two-junction monolithic tandem solar cell two terminal design of (AlxGa1-x)0.51In0.49P/GaAs yielding a best case pred ...

    SBIR Phase II 1993 Department of DefenseMissile Defense Agency
  2. Monolithically Interconnected, Thin Silicon Solar Cell Array

    SBC: ASTROPOWER, INC.            Topic: N/A

    ASTROPOWER PROPOSES TO DEVELOP A LIGHTWEIGHT, HIGH EFFICIENCY, MONOLITHICALLY INTERCONNECTED THIN SILICON SOLAR CELL ARRAY. THE ARRAY INCORPORATES AN INNOVATIVE TECHNIQUE TO ACHIEVE ELECTRICAL ISOLATION AND INTERCONNECTION OF THE ARRAY ELEMENTS. A MONOLITHICALLY INTERCONNECTED ARRAY TECHNOLOGY OFFERS REDUCED COST AND COMPLEXITY AS WELL AS INCREASED RELIABILITY AND YIELD COMPARED TO CONVENTIONAL SO ...

    SBIR Phase II 1994 Department of DefenseMissile Defense Agency
  3. IM Modeling/Simulation Tool for KEI Dynamic/Thermal Loads Associated with Stage Separation

    SBC: COMBUSTION RESEARCH & FLOW TECHNOLOGY INC            Topic: MDA06041

    Intense dynamic and thermal loads will occur during stage-separation events that are of major concern from both operational and safety viewpoints. The insensitive-munitions (IM) stimuli and thermal/dynamic response associated with such events has received very little attention, yet this is of major concern for the KEI vehicle undergoing Stage 1 to Stage 2 separation. The KEI event is at lower alti ...

    SBIR Phase II 2008 Department of DefenseMissile Defense Agency
  4. Optimal Sensor Scheduling for Ballistic Missile Defense

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: MDA06009

    Our Phase I research involved the development of an innovative sensor scheduling algorithm in support of Ballistic Missile Defense. This algorithm schedules multiple diverse and distributed sensors to perform time-critical tasks relating to multiple moving targets; specifically, to detect, classify, localize, track, support the interception of, and conduct BDA for ballistic missiles throughout t ...

    SBIR Phase II 2008 Department of DefenseMissile Defense Agency
  5. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  6. Safe High Power (High Rate) Lithium Battery for MKV (Missiles) with Long storage Life

    SBC: LithChem Energy / Div. of TOXCO, inc.            Topic: MDA06026

    r

    SBIR Phase II 2008 Department of DefenseMissile Defense Agency
  7. ADVANCED MATERIAL CONCEPTS FOR GUARDRAIL END TREATMENTS

    SBC: United Dynamics, Inc.            Topic: N/A

    GUARDRAIL TERMINALS ARE SOME OF THE MORE TROUBLESOME AND POTENTIALLY HAZARDOUS ROADSIDE APPURTENANCES. RECENTLY DEVELOPED TERMINAL CONCEPTS WHICH HAVE PASSED CURRENT CRASH TEST CRITERIA TEND TO BE EXPENSIVE AND MAY REQUIRE EXCESSIVE LENGTH OF NEED, FLARE-OUT SPACE AND ADDITIONAL FILL AND GRADING. THIS PHASE I SBIR PROPOSAL ADDRESSES THE DEVELOPMENT OF A MORE EFFICIENT ENERGY ABSORBING TERMINAL CON ...

    SBIR Phase II 1994 Department of Transportation
  8. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government