You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Whimbrel Unmanned Aircraft System-Borne Atmospheric and Sea Surface Temperature (SST) Sensor
SBC: PIASECKI AIRCRAFT CORP Topic: 845RWPPiasecki Aircraft (PiAC) proposes to continue development and testing efforts of the Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel USA has been developed to support the Tropical Cyclone Boundary Layer mission requirements and contains sensors an ...
SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Individualized Fatigue Management Program Technology for Trucking Operations
SBC: PULSAR INFORMATICS, INC. Topic: 091FM1This proposal leverages our current DOT-funded SBIR Phase II project developing software to assist truck drivers and companies to fatigue optimize driver scheduling and route planning. This project will build a set of web-services specially designed to provide objective quantitative feedback to truck drivers, dispatchers, and safety managers about fatigue from fatigue stressors common in trucking ...
SBIR Phase II 2015 Department of Transportation -
Hybrid Laser Arc Welding for Thick Plate High Performance Steels
SBC: TECHKNOWSERV CORP Topic: 132FH1Welding of HPS70W is well understood when using submerged arc welding (SAW) and shielded metal arc welding (SMAW) techniques. A Welding Advisory Group (WAG) which consisted of technical advisors from the Navy, AISI, and FHWA, major filler metal manufacturers, and steel producers determined the guidelines for welding HPS70W. As a result, comprehensive guidelines and welding procedures exist for SAW ...
SBIR Phase II 2015 Department of Transportation -
NDT of Fracture Toughness for Pipeline Steels
SBC: FBS INC Topic: 180PH1Fracture toughness is the material parameter that, along with applied loading and flaw geometry, dictates the critical crack size, and therefore controls the flaw size that must be detected during inspections. A major challenge facing pipeline operators is that many pipelines are old, making their structural integrity uncertain, and that material pedigree of the pipeline steel is unknown. Therefor ...
SBIR Phase II 2020 Department of Transportation