You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Whimbrel Unmanned Aircraft System-Borne Atmospheric and Sea Surface Temperature (SST) Sensor

    SBC: PIASECKI AIRCRAFT CORP            Topic: 845RWP

    Piasecki Aircraft (PiAC) proposes to continue development and testing efforts of the Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel USA has been developed to support the Tropical Cyclone Boundary Layer mission requirements and contains sensors an ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  2. New METSAT Display Service for Weather-Ready Nation

    SBC: CARR ASTRONAUTICS CORP            Topic: 843WP

    Phase II of the New METSAT Display project will produce a working beta version of the Earth Imaging product customized for NWS/NOAA as outlined in the Phase I proof of concept. This product will ingest imagery from a data source (in this case a web service of NOAA satellite imagery) and display it accurately on a globe of the Earth. Vector data such as roads, cities, towns, counties, states, etc. ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    This proposal leverages our current DOT-funded SBIR Phase II project developing software to assist truck drivers and companies to fatigue optimize driver scheduling and route planning. This project will build a set of web-services specially designed to provide objective quantitative feedback to truck drivers, dispatchers, and safety managers about fatigue from fatigue stressors common in trucking ...

    SBIR Phase II 2015 Department of Transportation
  4. Hybrid Laser Arc Welding for Thick Plate High Performance Steels

    SBC: TECHKNOWSERV CORP            Topic: 132FH1

    Welding of HPS70W is well understood when using submerged arc welding (SAW) and shielded metal arc welding (SMAW) techniques. A Welding Advisory Group (WAG) which consisted of technical advisors from the Navy, AISI, and FHWA, major filler metal manufacturers, and steel producers determined the guidelines for welding HPS70W. As a result, comprehensive guidelines and welding procedures exist for SAW ...

    SBIR Phase II 2015 Department of Transportation
  5. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  6. A System for Automated Analysis of Driver Glance Videos

    SBC: IMAGECORP, INC.            Topic: N/A

    ImageCorp, Inc. and its subcontractor M-Vision, Inc. propose to design and conduct a feasibility study of a machine vision system dedicated to the automatic analysis of the drivers¿ glancing direction. This system will be able to determine the beginning and end of the glancing activity in the video sequence, indexed by the subject (functional area of interest), duration, and direction of glance. ...

    SBIR Phase II 2001 Department of Transportation
US Flag An Official Website of the United States Government