You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Rapid Assessment of Air Void System in Fresh Concrete
SBC: DYNAFLOW, INC. Topic: 171FH2Proposal title: Rapid Assessment of Air Void in System in Fresh Concrete Air void parameters such as specific surface (SS) and spacing factor (SF) are essential in evaluating Freeze-Thaw (F-T) durability in fresh concrete. We have demonstrated the feasibility and viability of using an acoustic method to measure in near real time air void distributions in fresh concrete, the proposed solution is b ...
SBIR Phase II 2018 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
A System for Automated Analysis of Driver Glance Videos
SBC: IMAGECORP, INC. Topic: N/AImageCorp, Inc. and its subcontractor M-Vision, Inc. propose to design and conduct a feasibility study of a machine vision system dedicated to the automatic analysis of the drivers¿ glancing direction. This system will be able to determine the beginning and end of the glancing activity in the video sequence, indexed by the subject (functional area of interest), duration, and direction of glance. ...
SBIR Phase II 2001 Department of Transportation