You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Environmentally Neutral Electric Bike Share System
SBC: INNOVATIVE DYNAMICS INC. Topic: 142OS1IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commuting. This design is intended for usage alongside traditional bike share programs in cities across the country. The primary benefit is attract those otherwise unwilling to use bicycles to commute, either due to personal reservation or perceived terrain difficulties. This is accomplish ...
SBIR Phase II 2016 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
Development of Light-Weight, Low-Cost Multichannels Membrane Reformer
SBC: ATS-MER, LLC Topic: N/AA novel approach for the development of a lightweight, low-cost, compact, and quick start-up on-board fuel reformer is proposed in this Phase II program. The approach is based on a novel MER¿s technique for the fabrication of multichannel mini-reactors incorporating hydrogen separating membrane. Multichannel mini-reactor shrinks the dimensions through which energy and reactants travel to their ...
SBIR Phase II 2001 Department of Transportation