You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
Creating a Global Infrastructure for Virtual Aids to Navigation (vATON
SBC: WisdomTools Enterprises Inc Topic: N/AAs we look towards the next decade there are many opportunities to enhance services for navigation which compliment, enhance, and replace existing Aids to Navigation technologies. This Phase II project will continue the US Coast Guard¿s investigation of the development of a Virtual Aids to Navigation system by building a working prototype that delivers real-time data to the mariner. The vATON s ...
SBIR Phase II 2001 Department of Transportation -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AA SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...
SBIR Phase II 1985 Department of Transportation