You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Transportation
  2. VIDEO COMPRESSION FOR TRANSMISSION OF ATC DISPLAYS TO REMOTETOWER CAB

    SBC: DELTA INFORMATION SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  3. LONGITUDINAL STRESS (FORCE) MEASUREMENT OF RAIL UNDER OPERATING CONDITIONS

    SBC: Magnasonics Inc            Topic: N/A

    IN 1982, A SPECIAL COMMITTEE OF THE NMAB ISSUED A REPORT ON THE NONDESTRUCTIVE METHODS THAT MIGHT BE USED TO MEASURE THELOGITUDINAL FORCE IN INSTALLED RAILS. IT SHOWED THAT THE ACOUSTO-ELASTIC EFFECT WHICH INFERS THE STRESS FROM MEASURE MENTS OF SMALL SHIFTS IN THE VELOCITY OF SOUND WAS PROMISINGBUT DIFFICULT TO IMPLEMENT BECAUSE VARIATIONS IN THE METALLURGICAL STRUCTURE OF THE METAL AND UNCERTAIN ...

    SBIR Phase II 1986 Department of Transportation
US Flag An Official Website of the United States Government