You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: N/A

    Cities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...

    SBIR Phase I 2008 Department of Transportation
  2. Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials

    SBC: Integran Technologies U.S.A. Inc.            Topic: 07PH1

    This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...

    SBIR Phase I 2008 Department of Transportation
  3. Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials

    SBC: Integran Technologies U.S.A. Inc.            Topic: N/A

    This proposal describes the application of a mature nanotechnology-based crack arrest/structural repair technology as a novel in-field pipeline repair tool. The repair would be comprised of a thin layer or sleeve of electrodeposited nancrystalline material applied to the damaged region of the pipe in order to utilize the "crack filling" characteristic of the process. The concept proposed has alr ...

    SBIR Phase I 2008 Department of Transportation
  4. Microscopic Traffic Flow Simulation Models- An Open Source Approach

    SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION            Topic: 081FH5

    In the Open-source microscopic traffic simulation models project, a component based software framework is proposed to re-engineer CORISM data struture and CORISM interface. Under the architecture combing the innovative framework and the legacy CORISM, prototype of the open source traffic flow simulation models will be developed and demonstrated in the Phase I. In addition, areas identified by th ...

    SBIR Phase I 2008 Department of Transportation
US Flag An Official Website of the United States Government