You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Dynamic Frequency Passive Millemeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 94

    Passive microwave sensors aboard satellites provide valuable information regarding weather conditions by measuring atmospheric attenuation over a broad range of frequencies from 0-200 GHz. Additional ground-based sensors are desirable to provide complementary upward looking measurements that can be used to refine existing attenuation models. Operating over such a large bandwidth, however, places ...

    SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  3. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  4. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  5. RADAR TRAFFIC MONITOR FOR INTERSECTION TRAFFIC MANAGEMENT

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    ROADWAY INTERSECTION TRAFFIC MANAGEMENT SYSTEMS ACCOMPLISH COMMAND AND CONTROL USING VEHICLE SENSORS WITH COMPUTERS WHICH HAVE SOPHISTICATED PROGRAMS (SOFTWEAR). COMPUTER TECHNOLOGY HAS PROGRESSED MORE RAPIDLY IN RECENT YEARS THAN SENSOR TECHNOLOGY. WIRE LOOPS WHICH ARE LAID IN THE PAVEMENT ARE COSTLY TO INSTALL AND MAINTAIN AND ARE NOT EASILY RECONFIGURED FOR AN UPGRADE OF TRAFFIC CONTROL. A RADA ...

    SBIR Phase II 1984 Department of Transportation
US Flag An Official Website of the United States Government