You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Manufacturing Technology for the Practical Application of Specialized and Environmentally Sensitive Nutrients, Enzymes, Immune-Stimulating Compounds and Biologics to Aquafeeds

    SBC: Zeigler Bros, Inc.            Topic: 823F

    In an effort to support the development of a domestic marine aquaculture industry, Zeigler Bros. Inc., (ZBI) proposes to continue its Phase I research by demonstrating the ability to scale up inclusion particle (IP) manufacturing. During Phase II ZBI will also demonstrate the efficacy of IOs for orally delivering phytase and probiotics to marine finfish. These efforts will directly address the p ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  3. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  4. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  5. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  6. Instrumented Anchor Pin for Heavy Truck Brake

    SBC: Stratcom International Llc            Topic: N/A

    The bonded resistance strain gage has made possible a varety of force sensing transducers, commonly known as "load cells." Widely used types of load cells include the column, the bending beam, the ring, the circular plat and the shear web. To instrument the anchor pins used in heavy truck air braking systems, STRAINSERT will utilize proven research and evaluation techniques implemented during th ...

    SBIR Phase II 1997 Department of Transportation
  7. Innovative Energy Absorbing Composite Utility Poles

    SBC: United Dynamics, Inc.            Topic: N/A

    Utility poles present a serious roadside hazard due to the large number of poles located in close proximity to the roadways and the unforgiving nature of existing pole designs. Breakaway wooden utility poles have been developed over the past twenty years in an effort to improve utility pole safety, but these designs have not gained widespread acceptance. In order to realize safer utility poles w ...