You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DESIGN AND CONSTRUCTION OF A NOVEL HIGH FORCE MAGNETIC SEPARATOR

    SBC: Advanced Materials Corp            Topic: N/A

    THE PLANNED WORK IS AN INVESTIGATION OF HIGH ENERGY PERMANENT MAGNET SEPARATOR DESIGNS WHOSE EXPRESS PURPOSE IS TO PROVIDE AN EFFICIENT MEANS FOR SLURRY REACTOR WAX/CATALYST SEPARATION IN THE FISCHER-TROPSCH PROCESS USING AN IRON-BASED CATALYST. THESE STUDIES WILL INVOLVE MAGNETIC CIRCUIT MODELING AND OPTIMIZATION AS WELL AS BENCH-TYPE RUNS WITH SLURRY REACTOR WAXES/CATALYSTSO AS TO DETERMINE THE ...

    SBIR Phase I 1993 Department of Energy
  2. HIGH SPEED SHEET GROWTH OF THIN SILICON

    SBC: ASTROPOWER, INC.            Topic: N/A

    A NOVEL SILICON DEPOSITION PROCESS CAPABLE OF DEPOSITING HIGH QUALITY THIN-FILM SILICON LAYERS ON LOW COST SUPPORTING SUBSTRATES WILL BE INVESTIGATED IN PHASE I. THE SUBSTRATE WILL INCLUDE A REFLECTOR FOR LIGHT TRAPPING. THE PLANNED DEPOSITION PROCESS WILL ALLOW THE FORMATION OF SILICON LAYERS 20 TO 30 MICRONS THICK, OPTIMIZING THE PERFORMANCE OF CRYSTALLINE SILICON AS A SOLAR CELL MATERIAL. TH ...

    SBIR Phase I 1994 Department of Energy
  3. LOS COST, HIGH PURITY SILICON BY ALKALINE GLYCOLIC DIGESTION OF SILICA

    SBC: ASTROPOWER, INC.            Topic: N/A

    THE SOLAR CELL APPLICATION OF CRYSTALLINE SILICON THIN-FILM, PHOTOCOLTAIC (PV) TECHNOLOGIES IS CURRENTLY LIMITED BY THE HIGH COST OF THE SILICON RAW MATERIAL. THIS IS A RESULT OF THE CARBOTHERMAL REDUCTION METALLURGICAL PROCESS USED TO CREATE THE SEMICONDUCTOR-GRADE SILICON FROM SILICA. THERE IS A NOVEL ALTERNATIVE ORGANOSILICON CHEMISTRY, BASED ON ALKALINE GLYCOLIC DIGESTION OF SILICA, THAT DOE ...

    SBIR Phase I 1994 Department of Energy
  4. Isolation of Novel Hyper-Thermophiles for Increased Energy Efficiency in Ethanol Production

    SBC: Athena Biotechnologies, Inc.            Topic: 10b

    Bio-ethanol penetration into the marketplace is limited by its cost, making it non-competitive with petroleum-based fuels. Energy consumed during fermentation and distillation steps accounts for 17% of the total cost. Because fermentation is exothermic, the reactor must be cooled to preserve mesophilic microbial viability. Then, the product must then be heated to vaporize the ethanol for purificat ...

    SBIR Phase I 2008 Department of Energy
  5. A SUPERPLASTIC OXIDE DISPERSION STRENGTHENED MAGNESIUM ALLOY FOR AUTOMOTIVE APPLICATIONS

    SBC: Chesapeake Composites Corporation            Topic: N/A

    REDUCTION OF AUTOMOBILE WEIGHT IS AN IMPORTANT APPROACH TO REDUCING FUEL CONSUMPTION. MAGNESIUM ALLOYS WOULD OFFER THE POTENTIAL FOR SIGNIFICANT WEIGHT REDUCTIONS IF THEY WERE MORE READILY FORMED AND THEIR STIFFNESS COULD BE INCREASED. HIGH STRAIN RATE SUPERPLASTIC FORMING OFFERS A COST EFFECTIVE ROUTE FOR THE PRODUCTION OF AUTOMOTIVE COMPONENTS. HOWEVER, TO BE SUPERPLASTIC, MAGNESIUM ALLOYS MU ...

    SBIR Phase I 1994 Department of Energy
  6. CONTROL OF DIOXIN EMISSIONS FROM WASTE FUEL COMBUSTION BY COFIRING WITH COAL

    SBC: Coal Tech Corp.            Topic: N/A

    EXPERIMENTAL EVIDENCE INDICATES THAT SULFUR IN COAL SUPPRESSES DIOXIN FORMATION FROM CHLORINE COMPOUNDS DURING COAL COMBUSTION. THEREFORE, COFIRING COAL WITH HIGH CHLORINE, MUNICIPAL REFUSE DERIVED FUELS (RDF) OR PAPER INDUSTRY WASTES SHOULD BE EFFECTIVE IN SUPPRESSING DIOXIN FORMATION FROM THESE FUELS. SINCE SULFUR DIOXIDE (SO2) EMISSIONS MUST ALSO BE CONTROLLED IT ISDESIRABLE TO COMBINE DIOXIN A ...

    SBIR Phase I 1993 Department of Energy
  7. Dewatering Membrane for Hazy Hydrodesulfurization Unit Effluents

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 09

    Many refinery product streams, particularly those from Ultra Low Hydrodesulfurisation units, are prone to haze due to water emulsions. Haze is also problematic for biodiesel production, as hazy fuel cannot be used until the haze settles or is removed, which creates costly scheduling and shipping delays. This project will develop a novel membrane process for the removal of dissolved and dispersed ...

    SBIR Phase II 2008 Department of Energy
  8. Chemically and Thermally Resistant Hollow Fibers as Micro Channel Reactors for Process Intensification

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 10b

    Process intensification methodologies are need for the chemical processes and bioprocesses used in a biorefinery, in order to make the biorefinery a viable commercial alternative to the production of fuels and chemicals. Because the molecular mixing of reactants can enhance reactions, it is a key to process intensification. Significant process inefficiencies can occur (especially with highly react ...

    SBIR Phase I 2008 Department of Energy
  9. IMPROVING THE PERFORMANCE OF CONVENTIONAL AND COLUMN FROTH FLOTATION CELLS

    SBC: Cq Inc.            Topic: N/A

    BECAUSE OF MORE STRINGENT SULFUR DIOXIDE EMISSION RESTRICTIONS IMPOSED UNDER THE 1990 CLEAN AIR ACT AMENDMENTS AND THE IMPORTANCE OF RAW COAL COST AND PROCESSING COST, MANY DOMESTIC MINING COMPANIES PRODUCING HIGHER SULFUR CONTENT COALS WILL BE FORCED OUT OF BUSINESS FOR QUALITY AND/OR ECONOMIC REASONS. THIS SITUATION MAY FORCE THE CLOSURE OF MARGINAL OPERATIONS THAT ARE VITAL TO MANY STATE ECONO ...

    SBIR Phase I 1994 Department of Energy
  10. INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEM SIMULATION- IEMS(3)

    SBC: Data Communications Corp.            Topic: N/A

    THE PURPOSE OF THIS RESEARCH PROJECT IS TO DETERMINE THE FEASIBILITY OF MERGING AN EMERGENCY MEDICAL SERVICES (EMS) SIMULATOR WITH GEOGRAPHICAL INFORMATION SYSTEMS (GIS) IN ORDER TO PRODUCE IEMS(3) (INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEMS SIMULATOR), A PC-BASED SYSTEM WHICH CAN BE USED FOR BOTH ADDRESSING STRATEGIC PLANNING ISSUES OF EMS SYSTEMS (E.G., SYSTEM CONFIGURATION; VEHICLE LOCATION ...

    SBIR Phase I 1994 Department of Transportation
US Flag An Official Website of the United States Government