You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials
SBC: Integran Technologies U.S.A. Inc. Topic: 07PH1This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...
SBIR Phase I 2008 Department of Transportation -
Evaluation of Composite Joints in General Aviation (GA) Structures (MSC P1S21-118)
SBC: MATERIALS SCIENCES LLC Topic: N/ASimple, yet accurate engineering analytical tools will be developed for the evaluation of strength, durability and damage tolerance of composite bonded joints used in General Aviation (GA) structures with due consideration to adherend and adhesive thickness variations used (or present) in such joints. These tools and other available ones will be exercised for typical joint GA joint configurations ...
SBIR Phase I 2001 Department of Transportation -
From Nanoparticles to Novel Protective Garments
SBC: NanoScale Materials, Inc. Topic: N/ADESCRIPTION (provided by applicant): The goal of this project is to develop breathable, lightweight and disposable chemical protective clothing for use by personnel associated with law enforcement agencies, emergency medical services, medical/triage facili ties, and other federal, state, or local emergency agencies as well as by fire fighters and civilian first responders. This goal will be accomp ...
SBIR Phase II 2008 Department of Health and Human ServicesCenters for Disease Control and Prevention -
Hybrid Laser Arc Welding for Thick Plate High Performance Steels
SBC: TECHKNOWSERV CORP Topic: 132FH1Welding of HPS70W is well understood when using submerged arc welding (SAW) and shielded metal arc welding (SMAW) techniques. A Welding Advisory Group (WAG) which consisted of technical advisors from the Navy, AISI, and FHWA, major filler metal manufacturers, and steel producers determined the guidelines for welding HPS70W. As a result, comprehensive guidelines and welding procedures exist for SAW ...
SBIR Phase II 2015 Department of Transportation -
Individualized Fatigue Management Program Technology for Trucking Operations
SBC: PULSAR INFORMATICS, INC. Topic: 091FM1This proposal leverages our current DOT-funded SBIR Phase II project developing software to assist truck drivers and companies to fatigue optimize driver scheduling and route planning. This project will build a set of web-services specially designed to provide objective quantitative feedback to truck drivers, dispatchers, and safety managers about fatigue from fatigue stressors common in trucking ...
SBIR Phase II 2015 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 2001 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
Long Range ROW Detection and Warning System
SBC: NAVMAR APPLIED SCIENCES CORP Topic: 151FR7Rail line intrusion events, initiated by dismounted individuals on foot or in vehicles, often result in devastating collisions with a train, with outcomes unfavorably to the intruder. A need exists for a locomotive mounted advanced remote detection system that can autonomously detect and characterize an intruder, at a distance, alerting the operating engineer to take corrective action. Navmar Appl ...
SBIR Phase I 2015 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation