Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  2. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  3. N/A

    SBC: Advanced Fuel Research, Inc.            Topic: N/A

    This subtopic solicited Phase I R&D for an advanced Fourier transform infrared (FT-IR) system that would provide fast-scanning high resolution (3 scans/sec at 1cm-1 resolution), low noise, mid-infrared measurements for characterization of spray flames. In Phase I, Advanced Fuel Research, Inc. (AFR) demonstrated FT-IR emission/transmission (E/T) measurements from the NIST spray combustion faci ...

    SBIR Phase II 2001 Department of Commerce
  4. N/A

    SBC: Pathway Technologies, Inc            Topic: N/A

    Based on the outline for a theory of intelligence, and using NIST's hierarchical real-time control system (RCS) architecture, in Phase I, we developed proof-of-concept OpenSim and OpenAnimation toolboxes consisting of the following innovations, namely, (i) Simulation and Animation Software Design that will seamlessly interface with RCS Hierarchy, (ii) Knowledge hierarchy consistent with the f ...

    SBIR Phase II 2001 Department of Commerce
  5. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  6. An Optimized Semi-Flush Flasher

    SBC: Thoughtventions Unlimited Llc            Topic: N/A

    It is proposed to develop a full prototype next-generation semi-flush flasher system for airport runway approach lighting. Current systems are many years old and inefficient; airports need inset flashers to add runway length and more efficiently use strictly limited land allocations. An inset flasher is proposed that is optimized both optically and electrically. A flasher fixture based on the P ...

    SBIR Phase II 2001 Department of Transportation
US Flag An Official Website of the United States Government