You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NDT of Fracture Toughness for Pipeline Steels
SBC: FBS INC Topic: 180PH1Fracture toughness is the material parameter that, along with applied loading and flaw geometry, dictates the critical crack size, and therefore controls the flaw size that must be detected during inspections. A major challenge facing pipeline operators is that many pipelines are old, making their structural integrity uncertain, and that material pedigree of the pipeline steel is unknown. Therefor ...
SBIR Phase II 2020 Department of Transportation -
Accurate Nightlight for Satellite Calibration for Weather and Climate Applications
SBC: INNOVATIVE IMAGING & RESEARCH CORP Topic: 843This project’s aim is to develop an Accurate Active Light Source (AALS) that can be fielded at selected calibration sites to address NOAA’s unmet needs and improve the calibration of the Suomi NPP VIIRS Day Night Band (DNB) operating in the high gain stage (HGS) under low light level conditions. The DNB HGS has extreme low-light sensitivity that enables a new generation of nighttime imaging. M ...
SBIR Phase II 2016 Department of Commerce -
Probabilities of Business Impact Variables from CFS2 Ensembles
SBC: PRESCIENT WEATHER LTD Topic: 831The value of the subseasonal and seasonal probability (S2S) forecasts of the NWS Climate Forecast System Version 2 (CFS2) will increase substantially when they are converted into forecasts about business impact variables such as degree days, wind and solar power potential, end-of-season crop yield, water resource variables, and extremes of both weather and impacts themselves. In Phase II, our Phas ...
SBIR Phase II 2016 Department of Commerce -
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
N/A
SBC: Pathway Technologies, Inc Topic: N/ABased on the outline for a theory of intelligence, and using NIST's hierarchical real-time control system (RCS) architecture, in Phase I, we developed proof-of-concept OpenSim and OpenAnimation toolboxes consisting of the following innovations, namely, (i) Simulation and Animation Software Design that will seamlessly interface with RCS Hierarchy, (ii) Knowledge hierarchy consistent with the f ...
SBIR Phase II 2001 Department of Commerce