You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Intelligent Automated Software Construction through Researcher Modeling
SBC: DISCOVERY MACHINE INC Topic: N/AThe objective of this proposal is to investigate a set of software tools that aid researchers (i.e. scientists, inventors, designers, planners, or investors) in solving complex problems over large sets of data. The DiscoveryToolsTM system will provide acustomer-centered approach to computer automation. The customer (i.e. researcher) encodes problem-solving strategies through an easy-to-use graph ...
SBIR Phase II 2001 Department of DefenseDefense Advanced Research Projects Agency -
Worldwide Workflow: Software Applications for Asynchronous Collaboration
SBC: MAYA DESIGN Topic: N/AN/A
SBIR Phase II 2001 Department of DefenseDefense Advanced Research Projects Agency -
Fundamental Interactions Generating Heterogeneous Teams including Robots (FIGHT-R)
SBC: CHI SYSTEMS INC Topic: SB062009Fully autonomous, taskable robots for use in unconstrained environments are still a dream rather than a reality because of a host of problems, including capabilities of existing sensors, effectors, and control/planning software. Indeed, concepts of operations for robot use are tending toward robots collaborating directly with humans, in relationships similar to bomb squad dogs. Fortunately, enough ...
SBIR Phase II 2008 Department of DefenseDefense Advanced Research Projects Agency -
Silicon-Based Infrared Imaging Sensor
SBC: IRIMSENS, LLC Topic: SB062015Development of new short-wave infrared imaging sensors with signal processing electronics on the same substrate is critical for a number of military and commercial applications. The objective of this research is to develop a new generation of Ge-on-Si p-n heterojunction photodiodes that will culminate in a demonstration of a 64 x 64-pixel infrared imaging array. These photodiodes, whose feas ...
SBIR Phase II 2008 Department of DefenseDefense Advanced Research Projects Agency -
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Fuzzy Controller for Microbatteries in MEMS Micro Power Supply
SBC: US NANOCORP, INC. Topic: N/AThe Phase I SBIR program has successfully responded to a critical need in the MEMS community -- demonstration of a means to fabricate a fully integral micro power supply, where an energy scavenger (e.g., photovoltaics or RF device), energy storage device(battery, super capacitor, etc), and control circuitry (fuzzy logic-based, as proposed here) can all be fabricated in a single manufacturing opera ...
SBIR Phase II 2001 Department of DefenseDefense Advanced Research Projects Agency -
An Optimized Semi-Flush Flasher
SBC: THOUGHTVENTIONS UNLIMITED LLC Topic: N/AIt is proposed to develop a full prototype next-generation semi-flush flasher system for airport runway approach lighting. Current systems are many years old and inefficient; airports need inset flashers to add runway length and more efficiently use strictly limited land allocations. An inset flasher is proposed that is optimized both optically and electrically. A flasher fixture based on the P ...
SBIR Phase II 2001 Department of Transportation -
Risk Reduction Efforts for Mini-Diesel Engines Suitable for a Hybrid-Electric/Engine Powered Organic Aerial Vehicles
SBC: D-Star Engineering Corporation Topic: N/AUnder a Phase I SBIR Contract, D-STAR Engineering had defined a V/STOL Unmanned AerialVehicle system that can have a hybrid electric operation with a diesel engine, an electric motorand schemes for combining the two.The most critical technology that needs development for the UAV is a compact, light-weight, fuelefficient engine that can use military logistics fuels such as JP-8 / Diesel.This Phase ...
SBIR Phase II 2001 Department of DefenseDefense Advanced Research Projects Agency -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation