You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  2. N/A

    SBC: Pathway Technologies, Inc            Topic: N/A

    Based on the outline for a theory of intelligence, and using NIST's hierarchical real-time control system (RCS) architecture, in Phase I, we developed proof-of-concept OpenSim and OpenAnimation toolboxes consisting of the following innovations, namely, (i) Simulation and Animation Software Design that will seamlessly interface with RCS Hierarchy, (ii) Knowledge hierarchy consistent with the f ...

    SBIR Phase II 2001 Department of Commerce
  3. Novel Nitrogen Enriched Air for Fire Suppression

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): The objective of this Compact Membrane Systems (CMS) program is to develop a new platform technology for fire suppression and fire prevention systems around membrane supplied nitrogen enriched air (NEA). The limitation that the atmospheres used in the fire suppression be breathable to occupants in the proximity of a fire is easily accomplished by CMS technolog ...

    SBIR Phase II 2008 Department of Health and Human ServicesCenters for Disease Control and Prevention
  4. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  5. From Nanoparticles to Novel Protective Garments

    SBC: NanoScale Materials, Inc.            Topic: N/A

    DESCRIPTION (provided by applicant): The goal of this project is to develop breathable, lightweight and disposable chemical protective clothing for use by personnel associated with law enforcement agencies, emergency medical services, medical/triage facili ties, and other federal, state, or local emergency agencies as well as by fire fighters and civilian first responders. This goal will be accomp ...

    SBIR Phase II 2008 Department of Health and Human ServicesCenters for Disease Control and Prevention
  6. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  7. Accurate Nightlight for Satellite Calibration for Weather and Climate Applications

    SBC: INNOVATIVE IMAGING & RESEARCH CORP            Topic: 843

    This project’s aim is to develop an Accurate Active Light Source (AALS) that can be fielded at selected calibration sites to address NOAA’s unmet needs and improve the calibration of the Suomi NPP VIIRS Day Night Band (DNB) operating in the high gain stage (HGS) under low light level conditions. The DNB HGS has extreme low-light sensitivity that enables a new generation of nighttime imaging. M ...

    SBIR Phase II 2016 Department of Commerce
  8. Probabilities of Business Impact Variables from CFS2 Ensembles

    SBC: PRESCIENT WEATHER LTD            Topic: 831

    The value of the subseasonal and seasonal probability (S2S) forecasts of the NWS Climate Forecast System Version 2 (CFS2) will increase substantially when they are converted into forecasts about business impact variables such as degree days, wind and solar power potential, end-of-season crop yield, water resource variables, and extremes of both weather and impacts themselves. In Phase II, our Phas ...

    SBIR Phase II 2016 Department of Commerce
US Flag An Official Website of the United States Government