You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  2. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation
  3. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  4. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  5. Roadway Pavement Condition Sensor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This Phase II SBIUR (Small Business Innovative Research) proposal is based on work accomplished by Foster-Miller, Inc. and Battelle Memorial Institute during a prior Phase I SBIR program under contract DTRS57-99-C-00090. The purpose of the Phase I program was to develop an in-vehicle sensor to measure roadway surface conditions and, from these measurements, determine the coefficient of friction b ...

    SBIR Phase II 2001 Department of Transportation
  6. Compact Polarization Imaging System

    SBC: SPECTRAL SCIENCES INC            Topic: N/A

    During Phase II, Spectral Sciences Inc., proposes to develop innovative software tools for timely and highly specific characterization of the world littoral zones using data from new satellite-based hyperspectral imaging systems. SS Phase II objectivesinclude (1) develop a software package containing an automated LZ atmospheric correction code with advanced algorithms for determining ocean bot ...

    SBIR Phase II 2001 Department of DefenseNational Geospatial-Intelligence Agency
US Flag An Official Website of the United States Government