You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PDA-Based Portable Data Collection System for Commercial Vehicle Inspection
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 02FM1More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...
SBIR Phase II 2008 Department of Transportation -
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
POST CRASH AIRCRAFT FUEL-FED PREVENTION
SBC: BELTRAN, INC. Topic: N/ATHE PROPOSED PROGRAM INVESTIGATES COST-EFFECTIVE METHODS TO MITIGATE OR OBVIATE POST-CRASH JET FUEL FIRES THROUGH THE USE OF FUEL ADDITIVES, NONSTRUCTURAL WING TANK MODIFICATIONS, ETC., OR THROUGH EFFECTIVE AND EFFICIENT CONTROL AND EXTINGUISHMENT OF THE JET FUEL-FED FIRE. A SYSTEMS APPROACH STUDYING THE MOST PROMISING METHODS SUCH ASTHE FOLLOWING WILL BE UNDERTAKEN: 1)LIMITING OR PREVENTING FUEL ...
SBIR Phase II 1988 Department of Transportation -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AA SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...
SBIR Phase II 1985 Department of Transportation