You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Variable Conductance Heat Pipes for Radioisotope Stirling Systems
SBC: ADVANCED COOLING TECHNOLOGIES INC Topic: S203The overall technical objective of the proposed Phase II program is to complete a system-level demonstration to show the capability and benefits of integrating this backup radiator/Variable Conductance Heat Pipe (VCHP) with the Advanced Stirling Radioisotope Generator (ASRG). The Phase I project developed a feasible VCHP radiator design that can be integrated with the ASRG. In Phase II, a trade ...
SBIR Phase II 2008 National Aeronautics and Space Administration -
Vapor Compressor Driven Hybrid Two-Phase Loop
SBC: ADVANCED COOLING TECHNOLOGIES INC Topic: X1101The Phase I project successfully demonstrated the feasibility of the vapor compression hybrid two-phase loop (VCHTPL). The test results showed the high temperature-lift capability and robust operation under transient heat loads of the VCHTPL. At the end of Phase I, the VCHTPL technology reached the NASA's defined Technology Readiness Level (TRL) 4 (Component/breadboard validation in a laboratory e ...
SBIR Phase II 2008 National Aeronautics and Space Administration -
Fast Response Fabric Test Setup and Dynamic Fabric Model for BURNSIM
SBC: ADVANCED COOLING TECHNOLOGIES INC Topic: AF071025Advanced Cooling Technologies, Inc. (ACT) will develop a Fast Thermal Response Fabric Test Setup for various thermal hazard scenarios involving convection (hot gas impingement by the jet engine exhaust), radiation (fire) and combination of convection and radiation (post-crash fire of aircraft, fire flash or bomb blast). The fabric test setup will (i) measure the thermal response of various clothin ...
SBIR Phase II 2008 Department of DefenseAir Force -
Pressure Controlled Heat Pipe for Precise Temperature Control
SBC: ADVANCED COOLING TECHNOLOGIES INC Topic: S706The principal Phase II objective is to refine and further develop the prototype PCHP into a useful thermal management tool. The Phase I program established the feasibility of thermal control an axially-grooved heat pipe with a variable-volume reservoir. The follow-on Phase II program will address control system optimization, component longevity, reductions in mass and power, and show that the de ...
SBIR Phase II 2008 National Aeronautics and Space Administration -
Develop High-Temperature, Low-Humidity Aromatic Hydrocarbon-based H2/O2 Membranes for Proton Exchange Membrane (PEM) Fuel Cells
SBC: AKRON POLYMER SYSTEMS, INC. Topic: AF071130In order to achieve high performance at acceptable cost, PEM fuel cells are required to work at elevated temperature and low relative humidity (near 0 RH) for extended periods of time. However, to date, no commercial PEMs or publicly reported PEMs can meet these requirements. The objectives of this work are: (1) to develop PEMs that have high proton conductivities (50-100 mS/cm) and low area-spec ...
SBIR Phase II 2008 Department of DefenseAir Force -
Physical Improvements in Exciter/Igniter Units
SBC: Alphaport, Inc. Topic: X903The proposed Phase 2 project consists of the physical integration of our Phase 1 small, compact exciter with a "flight like" igniter or spark plug capable of hot-fire testing. The exciter/igniter unit will operate to a pre-established subset of expected flight performance requirements established and met in Phase 1. The exciter/igniter unit will physically integrate the exciter electronics with ...
SBIR Phase II 2008 National Aeronautics and Space Administration -
Environmentally Friendly Cleaning for Titanium Welds and Brazing
SBC: APPLICATIONS TECHNOLOGIES CO.LLC Topic: AF06326The first critical step in welding or brazing is cleaning to remove surface contamination. The Air Force has a need for an environmentally cleaning method that has no waste stream, minimal requirements of personal safety protection, and does not impact component integrity. The Arc Scrubber is an emerging non-chemical cleaning technology that utilizes and electrical arc to remove surface contamin ...
SBIR Phase II 2008 Department of DefenseAir Force -
Unresolved Resident Space Object Characterization Using Time-Frequency Analysis
SBC: APPLIED OPTIMIZATION, INC. Topic: AF071283Applied Optimization, Inc. [AO] proposes to demonstrate full feature characterization of unresolved RSOs by performing spectral unmixing and time-frequency analysis of its time and spectrally resolved signature in the visible or infrared spectrum. The characterization will be performed step-by-step by following a taxonomy of feature extraction. Materials identification will be performed via spectr ...
SBIR Phase II 2008 Department of DefenseAir Force -
Advanced NDE for SiC Optics Using Micromachined High Frequency Phased Array Ultrasound
SBC: TRS CERAMICS, INC. Topic: AF071142TRS is pleased to propose an in-situ NDE imaging tool for SiC mirror surface damage (SD), sub-surface damage (SSD) and trapped internal stress detection using piezo-composite based micromachined ultrasound transducer (PCMUT) phased array technology. PCMUT technology has been developed at TRS to fabricate high frequency ultrasound transducers with broad bandwidth and high sensitivity. Phased array ...
SBIR Phase II 2008 Department of DefenseAir Force -
Cryogenic Stepping Piezomotor for Large Torque, Precise Rotary and Linear Motion Control in Passive Optics
SBC: TRS CERAMICS, INC. Topic: S601TRS Technologies, Virginia Tech., and MTech, Inc. propose to develop high torque (>1.5 kg-cm), lightweight (< 250 g), low power (< 2 watts), high precision (
SBIR Phase II 2008 National Aeronautics and Space Administration