You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Microscopic Traffic Flow Simulation Models- An Open Source Approach

    SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION            Topic: 081FH5

    PHASE II TECHNICAL OBJECTIVE The major objective of this Phase II proposal is to establish open source traffic simulation model and software, and to develop application programming interfaces to accommodate future traffic research needs. Objectives will be accomplished by building and demonstrating FOMM, an open source traffic simulation model and software. Furthermore, to accommodate future resea ...

    SBIR Phase II 2011 Department of Transportation
  2. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  3. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  4. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  5. N/A

    SBC: Pathway Technologies, Inc            Topic: N/A

    Based on the outline for a theory of intelligence, and using NIST's hierarchical real-time control system (RCS) architecture, in Phase I, we developed proof-of-concept OpenSim and OpenAnimation toolboxes consisting of the following innovations, namely, (i) Simulation and Animation Software Design that will seamlessly interface with RCS Hierarchy, (ii) Knowledge hierarchy consistent with the f ...

    SBIR Phase II 2001 Department of Commerce
  6. VIDEO COMPRESSION FOR TRANSMISSION OF ATC DISPLAYS TO REMOTETOWER CAB

    SBC: DELTA INFORMATION SYSTEMS INC            Topic: N/A

    THIS DOCUMENT IS AN SBIR TECHNICAL PROPOSAL SUBMITTED TO THEFEDERAL AVIATION ADMINISTRATION BY DELTA INFORMATION SYSTEMS, INC. IN RESPONSE TO SBIR SOLICITATION NUMBER 91-FA11. THE PURPOSE OF THE PROPOSED PROGRAM IS TO INVESTIGATE, ANALYZE, AND DESIGN ALTERNATIVE DATA COMPRESSION SYSTEMS TO EFFICIENTLY TRANSMIT AIR TRAFFIC CONTROL DISPLAY DATA FROM MAJOR AIRPORTS TO SMALLER SATELLITE AIRPORTS ON LI ...

    SBIR Phase II 1992 Department of Transportation
US Flag An Official Website of the United States Government