You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Passivation Coatings for RF Power Devices

    SBC: ADVANCED COOLING TECHNOLOGIES INC            Topic: 13d

    This project aims to increase the reliability of radio frequency (RF) devices used in accelerator facilities by reducing/eliminating corrosion and erosion produced from the high purity de-ionized water cooling systems. Although metal interconnects are required for electrical and thermal performance, they susceptible to two major failure mechanisms, corrosion and erosion. Currently RF lo ...

    SBIR Phase II 2012 Department of Energy
  2. An Industrial Membrane System Suitable for Distributed Used Oil Re-Refining

    SBC: Media and Process Technology Inc.            Topic: 09c

    Nationwide about 2.4 billion gallons of lubricants are consumed annually for automotive crankcase (about 58%), industrial processes, machine lubrication, mining, and others. About 1 billion gallons/yr is currently collected as waste oil, equivalent to1-1.5% of annual US crude oil import volume. Presently, about 9% of the collected used oil is re-refined at six facilities in US. The majority of t ...

    SBIR Phase II 2012 Department of Energy
  3. Unconventional Compact Wound Glass Capacitors for Pulsed Power System in RF Accelerators

    SBC: Strategic Polymer Sciences, Inc.            Topic: 67f

    Capacitors are critical components in power modulator systems for radio frequency accelerator technology, in power electronics in electric vehicles, wind energy, and photovoltaic panels, and in directed energy weapon systems. Current capacitors have low energy density and occupy 30-50% volume of the devices. We propose to develop advanced wound capacitors with a specialty flexible ultrathin glass ...

    SBIR Phase II 2012 Department of Energy
  4. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation policy making, work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations (Van Dongen et al. 2003; Mollicone et al. 2010). Our group was the first to document the considerable magn ...

    SBIR Phase II 2012 Department of Transportation
  5. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  6. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  7. PipeTaz: Automated Pipe Asbestos Insulation Removal and Processing System

    SBC: AUTOMATIKA, INC.            Topic: N/A

    60104 Asbestos abatement costs, associated with the DOE¿s national weapons¿ complex clean-up efforts, may amount to $300-500 million, while nationally, asbestos abatement may cost more than $100 billion over the next 25 years. Abatement methods have changed little in the past 20 years, and there is a need for a cheaper, faster, and safer abatement method. This project will design, buil ...

    SBIR Phase II 2001 Department of Energy
  8. Harsh Fluorochemical Separations

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    60311 There are economic and environmental justifications for replacing conventional distillation processes with simpler membrane separations in certain applications. However, at present, there are no commercial membranes able to withstand the aggressive conditions associated with important industrial chemicals, including hydrogen fluoride, hydrogen chloride, and ozone. Prototype, chemic ...

    SBIR Phase II 2001 Department of Energy
  9. Membranes for Reverse Organic-Air Separations

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    60395 Emissions of volatile organic compounds (VOC) from gasoline refueling facilities continue to be an energy, safety, and environmental issue. In such applications, it is desired to vent the air in the system and keep the VOC behind. This project will develop a reverse separation membrane (RSM) system that allows for rapid venting of air while retaining the gasoline in underground storag ...

    SBIR Phase II 2001 Department of Energy
  10. Dewatering Membrane for Hazy Hydrodesulfurization Unit Effluents

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 09

    Many refinery product streams, particularly those from Ultra Low Hydrodesulfurisation units, are prone to haze due to water emulsions. Haze is also problematic for biodiesel production, as hazy fuel cannot be used until the haze settles or is removed, which creates costly scheduling and shipping delays. This project will develop a novel membrane process for the removal of dissolved and dispersed ...

    SBIR Phase II 2008 Department of Energy
US Flag An Official Website of the United States Government