You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  2. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  3. Individual SOF Operator Combined Sensor System

    SBC: PVP ADVANCED EO SYSTEMS, INC.            Topic: N/A

    PVPAEO proposes to build on the successful development of a head worn sensor package providing and displaying simultaneous images from LWIR and NIR sensors using a single aperture. The enhanced system will incorporate a higher resolution LWIR sensor andan image intensified camera. Pixel level sensor fusion demonstrated in a laboratory environment as part of the phase I effort will be incorporate ...

    SBIR Phase II 2001 Department of DefenseSpecial Operations Command
  4. Automated Feature Extraction Capabilities for the Development of High-Resolution GEOINT Feature Data and Constructing Correlated Databases

    SBC: Technology Service Corporation            Topic: SOCOM06012

    The Phase I program demonstrated the feasibility of using optical and LIDAR data to accurately extract structures, vertical obstructions, power lines, and road networks. In the Phase II program, TSC proposes to further develop the extraction techniques, and to develop prototype software at TRL level 6. The software will use a knowledge-based expert system (KBES) for classification, trained with ...

    SBIR Phase II 2008 Department of DefenseSpecial Operations Command
  5. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  6. Safer, Greener, User-Friendly Bus and Rail Transit

    SBC: Bevilacqua-Knight Inc.            Topic: 101FT1

    Our Phase I effort demonstrated that a small air/steam propulsion system could provide immediate power without a boiler, and that power could be varied by varying the ration of water and air in the propellant mix. In this proposed Phase II effort this same system will be scaled to a larger bench version for analysis of performance and efficiency. Following analysis of that data, the system will ...

    SBIR Phase II 2012 Department of Transportation
  7. FH3ESYSC

    SBC: E-SYSTEMS COMMUNICATIONS, CORP.            Topic: 102FH3

    The goal of this research is to study the feasibility that mobile devices have the capabilities and accuracy to be used as positioning devices for connected vehicles programs. We will demonstrate this proposition by implementing positioning capturing apps using the build in GPS and accelerometers, and then enhancing it with Dead Reckoning and triangulated algorithms. We will show the capabilities ...

    SBIR Phase II 2012 Department of Transportation
  8. Transportation System Performance Measurement Using Existing Loop Infrastructure

    SBC: Iteris Inc.            Topic: 102FH2

    Research finding during Phase I of this project have led the research team to conclude that it is feasible to use 60-Hz samples from single loop detectors in order to perform re-identification between loop detector stations on freeways. The method employed was robust to loop calibration errors, easily corrects for metadata concerning the exact location of the loops and demonstrated that it was po ...

    SBIR Phase II 2012 Department of Transportation
  9. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation policy making, work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations (Van Dongen et al. 2003; Mollicone et al. 2010). Our group was the first to document the considerable magn ...

    SBIR Phase II 2012 Department of Transportation
  10. Commercialization of DGPS Compression and Modeling Methods for Vehicle Use

    SBC: SUB CARRIER SYSTEMS CORPORATION            Topic: 102FH1

    The primary technical objective to be achieved during Phase II is the transition from the developed laboratory prototype, which clearly demonstrated the feasibility and superior outcomes of the approach, to a deployable system consisting of two key elements (the reference station - compression side and the rover - expansion side) and packaging them into a form suitable for commercial sales to earl ...

    SBIR Phase II 2012 Department of Transportation
US Flag An Official Website of the United States Government