You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automated parking-cruising detection and measurement using Bluetooth AVI Sensor network

    SBC: RAPID FLOW TECHNOLOGIES            Topic: 142FH2

    Searching for street parking, a behavior known as cruising for parking, leads to excess congestion and pollution. Many recent smart parking interventions have attempted to address this issue, but the problem of effectively detecting and measuring cruising remains largely unsolved. The goal of this work is to develop methods to detect and measure cruising for parking and its effects on congestion u ...

    SBIR Phase II 2017 Department of Transportation
  2. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    The Next Generation Equipment Committee (NGEC) developed a standard for specifying the use of an Ethernet based digital train line (DTL) network to replace the COMM line for passenger trains. These specifications are PRIIA 305‐919 Digital Train Line Hardware and PRIIA 305‐920 Digital Train Line Software. The intent Is to eventually allow for the improvement of passenger train control. DTL spec ...

    SBIR Phase II 2017 Department of Transportation
  3. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation policy making, work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations (Van Dongen et al. 2003; Mollicone et al. 2010). Our group was the first to document the considerable magn ...

    SBIR Phase II 2012 Department of Transportation
  4. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  5. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  6. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  7. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
US Flag An Official Website of the United States Government