You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Manufacturing Technology for the Practical Application of Specialized and Environmentally Sensitive Nutrients, Enzymes, Immune-Stimulating Compounds and Biologics to Aquafeeds

    SBC: Zeigler Bros, Inc.            Topic: 823F

    In an effort to support the development of a domestic marine aquaculture industry, Zeigler Bros. Inc., (ZBI) proposes to continue its Phase I research by demonstrating the ability to scale up inclusion particle (IP) manufacturing. During Phase II ZBI will also demonstrate the efficacy of IOs for orally delivering phytase and probiotics to marine finfish. These efforts will directly address the p ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion

    SBC: Savari Inc.            Topic: 111FH2

    In this proposal, we have proposed a program for twenty months to build on the basic ideas and feasibility developed in Phase I of this SBIR in order to demonstrate the practical use of DSRC technologies with signal controller for adaptive timing with a goal towards commercialization. Specifically, we intend to further develop, build and integrate advanced signal control algorithms that make use o ...

    SBIR Phase II 2013 Department of Transportation
  3. Smartphone Signal Alert Status

    SBC: Savari Inc.            Topic: 111FH1

    The primary objective for Phase I was to design and develop a proof of concept system demonstrating the basic functionality and feasibility to deploy technology in the field. During the six-month effort, a detailed Concept of Operations document was prepared that served as a foundation for the design and development of the SmartCross system. The core components of the system: (a) Smartphone applic ...

    SBIR Phase II 2013 Department of Transportation
  4. Transportation System Performance Measurement Using Existing Loop Infrastructure

    SBC: CLR ANALYTICS INC            Topic: 102FH2

    With continuing emphasis on transportation sustainability and fiscal stewardship, utilizing existing loop detector infrastructure to obtain more accurate, reliable and comprehensive traffic system performance measures is desired by many transportation agencies. In Phase I study, we found that the capability of the Inductive Loop Detector (ILD) signature technology to re-identify and classify vehic ...

    SBIR Phase II 2013 Department of Transportation
  5. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  6. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  7. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
US Flag An Official Website of the United States Government