You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Short Duration, High Altitude, Mixed Continuum/Non-Continuum Flowfield

    SBC: COMBUSTION RESEARCH & FLOW TECHNOLOGY INC            Topic: A13005

    The increasing sophistication of missile defense technologies has resulted in the equally increasing sophistication of defense mitigating technologies. Whereas first generation systems concentrated on early detection, early boost phase, and/or terminal phase intercepts (i.e. low-altitudes), the current paradigm is to create systems that address all areas of the threat trajectory, increasingly in t ...

    SBIR Phase II 2015 Department of DefenseArmy
  2. Electro-Optically Guided Radar Imaging

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: A13040

    Herein, PSI proposes to leverage extensive development in the area of optically sampled passive millimeter-wave imaging to develop dual mode active/passive imagers that provide both the intuitive, real-time imagery of a passive imager and the ranging capabilities of an active sensor. To accomplish this task, an optically sampled millimeter-wave receive array is sampled via optical pulsed laser gat ...

    SBIR Phase II 2015 Department of DefenseArmy
  3. Friction Material (brake pads) for Metal Matrix Drums

    SBC: Century, Inc.            Topic: A13069

    Century has designed and manufactured aluminum metal matrix composite (MMC) brake drums for multiple applications both military and commerical with great success. Applications include axle loads ranging from 8,000 to 23,000 lbs. As applications vary the torque requirements of the brake system also vary. To work with multiple brake systems, multiple friction materials may be required to couple the ...

    SBIR Phase II 2015 Department of DefenseArmy
  4. In-Plane Conductivity Improvement to Fiber Reinforced Composite Materials (MSC P4188)

    SBC: MATERIALS SCIENCES LLC            Topic: A13070

    Missile modernization and future missile designs are utilizing more sophisticated and higher powered electronics in the pursuit of extended missile range, improved accuracy and precision targeting for striking enemy threats. Tight packaging and sophistication of these electronic systems can generate significant heat loads, which needs to be dissipated efficiently in order to maintain functionality ...

    SBIR Phase II 2015 Department of DefenseArmy
  5. Advanced Rapid Non-destructive test method to determine chemical composition of concrete materials in the field

    SBC: METNA CO            Topic: 122FH2

    NMR offers comprehensive capabilities for quantitative investigation of the chemistry, structure and deterioration conditions of concrete. Single-sided NMR provides opportunities for nondestructive, spatially resolved field evaluation of concrete. A first-generation single-sided NMR system was developed in Phase I project, and its potential for investigation of concrete deterioration mechanisms wa ...

    SBIR Phase II 2015 Department of Transportation
  6. Whimbrel Unmanned Aircraft System-Borne Atmospheric and Sea Surface Temperature (SST) Sensor

    SBC: PIASECKI AIRCRAFT CORP            Topic: 845RWP

    Piasecki Aircraft (PiAC) proposes to continue development and testing efforts of the Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel USA has been developed to support the Tropical Cyclone Boundary Layer mission requirements and contains sensors an ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Thermal Infrared Detection of Aerosolized Bacterial Spores

    SBC: MESH INC            Topic: A13098

    Protection of fixed sites from biological or chemical (CB) aerosol plume attacks depends on early warning and confirmatory evidence to provide time and information to take the appropriate mitigating actions. An effective sensing system requires continuous, autonomous, and rapid coverage of large surrounding areas. Most qualitative CB sensors used for identification purposes are too expensive or to ...

    SBIR Phase II 2015 Department of DefenseArmy
  8. High-Performance, Low-Power, Acceleration-Compensated Oscillator Technology

    SBC: EPACK, INC.            Topic: A14031

    The objective of this proposal is to completer the development for a new miniaturized and very low power oscillator product which provides very low phase noise even under high vibration environments. This technology will be called the Low Power, G-Compensated, Oven Controlled Crystal Oscillator (LPG-OCXO). Current state of the art acceleration compensated oscillators are 100-350 cubic centimeters ...

    SBIR Phase II 2015 Department of DefenseArmy
  9. SMART Autonomous Warfighter Universal Power Converter

    SBC: QORTEK INC            Topic: A13095

    A novel bidirectional power converter module is proposed utilizing a new converter topology enabling true bidirectional operation by intelligent control of modified switched mode power architecture. This architecture facilitates the creation of a multi-t Benefits

    SBIR Phase II 2015 Department of DefenseArmy
  10. Develop Efficient/Leak Proof M1 Abrams Plenum Seal

    SBC: GREAT LAKES SOUND & VIBRATION INC            Topic: A13061

    A Phase II proposal has been written that extends the results from Phase I and outlines a path to produce an improved plenum seal for the M1 Abrams tank. Phase II will focus on developing a well-engineered set of performance requirements for the plenum s

    SBIR Phase II 2015 Department of DefenseArmy
US Flag An Official Website of the United States Government