You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Whimbrel Unmanned Aircraft System-Borne Atmospheric and Sea Surface Temperature (SST) Sensor

    SBC: PIASECKI AIRCRAFT CORP            Topic: 845RWP

    Piasecki Aircraft (PiAC) proposes to continue development and testing efforts of the Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel USA has been developed to support the Tropical Cyclone Boundary Layer mission requirements and contains sensors an ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    This proposal leverages our current DOT-funded SBIR Phase II project developing software to assist truck drivers and companies to fatigue optimize driver scheduling and route planning. This project will build a set of web-services specially designed to provide objective quantitative feedback to truck drivers, dispatchers, and safety managers about fatigue from fatigue stressors common in trucking ...

    SBIR Phase II 2015 Department of Transportation
  3. Hybrid Laser Arc Welding for Thick Plate High Performance Steels

    SBC: TECHKNOWSERV CORP            Topic: 132FH1

    Welding of HPS70W is well understood when using submerged arc welding (SAW) and shielded metal arc welding (SMAW) techniques. A Welding Advisory Group (WAG) which consisted of technical advisors from the Navy, AISI, and FHWA, major filler metal manufacturers, and steel producers determined the guidelines for welding HPS70W. As a result, comprehensive guidelines and welding procedures exist for SAW ...

    SBIR Phase II 2015 Department of Transportation
  4. Countermeasures to Covert Access Methods to Reduce Attack Susceptibility and Ensure Trust

    SBC: EDAPTIVE COMPUTING INC            Topic: OSD09IA2

    ABSTRACT:Sophisticated methods for infiltrating and compromising computer systems have continuously demonstrated their ability to defeat current operating system and network defenses. Computing assets such as the BIOS, hardware device drivers, and COTS hardware from non-trusted supply chains have been proven to include malware and/or Trojan horse applications. These subversive software programs pr ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  5. Environmental Control Unit with Integrated Thermal Storage

    SBC: ADVANCED COOLING TECHNOLOGIES INC            Topic: OSD13EP1

    Military Environmental Control Units (ECUs) represent one of the dominant energy users in forward operating environments, and significant effort is being made to improving overall ECU efficiency [1]. Reducing overall Size, Weight and Power (SWaP) of military ECUs is complicated by the transient, yet predictable, nature of the thermal demand profile over the course of a typical daily usage cycle, ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  6. BLAST: A System for Bandwidth- and Latency-Scalable Teleoperation

    SBC: Neya Systems, LLC            Topic: OSD13HS3

    This topic addresses the problem of robustly commanding and controlling unmanned ground vehicles operating in complex, unstructured environments. Current approaches to this task rely on dense scene reconstruction from a variety of sensor data such as LIDAR and video imagery. Scene representations are then relayed to a remote human operator who provides commands at varying levels of supervisory con ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  7. Deep Analytics for Data in Cyber-Physical Systems

    SBC: EDAPTIVE COMPUTING INC            Topic: OSD13LD1

    Our proposal specifically addresses the stated requirements of the solicitation; we will develop and deploy tools, methods, and models for improving collaboration between human and cyber-physical systems. The proposed HARVEST Phase II solution builds on previous Edaptive Computing, IncInc. (ECI) knowledge and technology itself innovative to create a knowledge discovery system which extracts and ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  8. Stress Testing Robustness to Exceptional Situations in Simulation

    SBC: EDGE CASE RESEARCH INC            Topic: OSD141AU4

    Recent advancements in sensor simulation tools [2] have improved our ability to model radar, lidar, camera, and GPS with software/hardware in the loop. Of course, our ability to model the physics of heavy trucks [3] is quite mature as well. To address the challenge of developing the STE, we will provide our autonomy algorithms as Government Furnished Equipment (GFE). The focus of this topic ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  9. High Power Density SOFC Stack

    SBC: NEXTECH MATERIALS, LTD.            Topic: OSD13EP4

    Small unmanned aerial systems (S-UAS), unmanned ground systems (UGS), vehicle auxiliary power units (APU), and mobile power generation units require high efficiency power systems capable of operating on logistically available fuels (JP-8, diesel) to enable long endurance operation.In particular, S-UASs in the Group 2 (2155 lbs)/Group 3 ( 150 cm2 active area) in the Phase I and then to the stack le ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  10. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government