You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Smart Grade Crossing Monitor System

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 101FR2

    During Phase I, IEM developed a proof of concept for a Smart Grade Crossing Monitor (SGCM) using multispectral imaging technology for enhanced monitoring of highway rail grade crossings to improve safety by providing warnings of significant objects present in the crossing. The Phase I work conclusively demonstrated that multispectral imaging is clearly superior to visible or infrared spectrum imag ...

    SBIR Phase II 2011 Department of Transportation
  2. Technology Transfer of Multimodal Biometric Application Resource Kit (MBARK)

    SBC: Ad Harmony            Topic: N/A

    The technical objective of this project is to develop a prototype of a face recognition application in a cloud computing environment utilizing MBARK as the middleware. The application will have a client piece that will run on a mobile device such as a laptop and a server piece that will run on a higher-performance computing cluster. The specific objectives of this development project can be enumer ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  3. PDA-Based Portable Data Collection System for Commercial Vehicle Inspection

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 02FM1

    More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...

    SBIR Phase II 2008 Department of Transportation
  4. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  5. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  6. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  7. Cyclops Abyssal Benthic Sampler: (CABS)

    SBC: Cyclops Research & Development, Inc.            Topic: N/A

    Not Available Not Available

    SBIR Phase II 2001 Department of Commerce
  8. N/A

    SBC: Pathway Technologies, Inc            Topic: N/A

    Based on the outline for a theory of intelligence, and using NIST's hierarchical real-time control system (RCS) architecture, in Phase I, we developed proof-of-concept OpenSim and OpenAnimation toolboxes consisting of the following innovations, namely, (i) Simulation and Animation Software Design that will seamlessly interface with RCS Hierarchy, (ii) Knowledge hierarchy consistent with the f ...

    SBIR Phase II 2001 Department of Commerce
  9. N/A

    SBC: X-RAY OPTICAL SYSTEMS, INC.            Topic: N/A

    This SBIR Phase II project will significantly improve the quality of elemental analysis in SEMS under partial pressure conditions by using a polycapillary x-ray optic in front of the energy dispersive spectrometer (EDS) in low-vacuum scanning electron microscopes (LV-SEM) or environmental SEMs (ESEM). LV-SEMS and ESEMs are designed to work at elevated sample chamber pressures to allow analysi ...

    SBIR Phase II 2001 Department of Commerce
US Flag An Official Website of the United States Government