You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...

    SBIR Phase I 2009 Department of Transportation
  2. PDA-Based Portable Data Collection System for Commercial Vehicle Inspection

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 02FM1

    More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...

    SBIR Phase II 2008 Department of Transportation
  3. High Speed Photolytic Cleaning of Third Rail Insulator Cleaning

    SBC: Phoenix Science & Technology            Topic: 07FT4

    This project addresses the specific need for an improved method for cleaning insulators that electrically isolate the third rail. Current methods are labor intensive and expensive, but the insulators should be cleaned regularly to avoid even greater expense. This project is to adapt an innovative photolytic paint stripper to cleaning insulators for the third rail. The overall objective is to de ...

    SBIR Phase I 2008 Department of Transportation
  4. Quick-release Emergency Egress Panel on Cab Car End Doors

    SBC: TIAX LLC            Topic: 07FR2

    The FRA has identified cab car end door kick panels as possible emergency egress panels. They could be used in circumstances where the convential emergency exits are unusable. The industry has operational and maintenance concerns. The objectives of this SBIR are to define the requirements for end door emergency egress panels and identify alternative design approaches and assess their effectiven ...

    SBIR Phase I 2008 Department of Transportation
  5. Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials

    SBC: Integran Technologies U.S.A. Inc.            Topic: 07PH1

    This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...

    SBIR Phase I 2008 Department of Transportation
  6. Concrete Environmental Monitoring Sensor

    SBC: AVS US INC            Topic: 07FH3

    With infrastructure costs escalating it is becoming essential to monitor the health of concrete structures so that timely maintenance can maximize their useful lives. This SBIR will demonstrate the feasibility of using a passive sensor, embedded within concrete, to measure mositure, temperature, pH and concentrations of chlorides. It will provide critical data for evaluating concrete performance s ...

    SBIR Phase I 2008 Department of Transportation
  7. Multi-Point Optical Sensor-Based Roof Measurement System for Use in Dynamic Rollover Testing

    SBC: Boxboro Systems LLC            Topic: 07NH2

    An optical, non-contact roof deformation monitoring system will be designed based on an existing multi-point, non-contact, multi-axis optical sensor-based measurement system that is currently used to measure chest deflection in crash-test dummies. The research involves determining suitable components to be used in the optical path, from high-power LED arrays through lenses and optical sensors. T ...

    SBIR Phase I 2008 Department of Transportation
  8. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  9. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation
  10. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government