You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Multi-Pedestrian Counting System Using Fusion of Stereo Camera and Laser Scanner

    SBC: Migma Systems Inc.            Topic: 091FH4

    In Phase I, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner were selected for use. We have demonstrated that our pedestrian counting system can count multiple pedestrians walking in a large group, maintain individual tracks even when some pedestrians walk in unpredictable patterns or leave the crosswalk prematur ...

    SBIR Phase II 2011 Department of Transportation
  2. Stress and Geometry Imaging from Outside the Pipeline

    SBC: JENTEK SENSORS, INC.            Topic: 111PH1

    There is a well defined, yet unfulfilled need for a convenient (non-contact, light weight) and rapid imaging tool for multi-directional, thru-wall stresses (both applied and residual) from the outside of a pipeline. Quantitative stress imaging is needed at mechanical damage and corrosion sites, as well as at other critical locations (dents, bends, etc.). JENTEK is uniquely positioned to deliver ...

    SBIR Phase I 2011 Department of Transportation
  3. Composite Cylinder Life-Cycle In-Service Assessment

    SBC: WavesinSolids LLC            Topic: 101PH1

    Current inspection, maintenance and lifetime estimation practices for composite cylinders have been adopted from earlier NASA research. WavesinSolids LLC are proposing a technological based on an acoustic emission (AE) technique for the in-service testing of composite cylinders. The approach will establish the correlation between AE activity and intensity metrics and the stress intensity factor, a ...

    SBIR Phase I 2011 Department of Transportation
  4. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...

    SBIR Phase I 2009 Department of Transportation
  5. High Speed Photolytic Cleaning of Third Rail Insulator Cleaning

    SBC: Phoenix Science & Technology            Topic: 07FT4

    This project addresses the specific need for an improved method for cleaning insulators that electrically isolate the third rail. Current methods are labor intensive and expensive, but the insulators should be cleaned regularly to avoid even greater expense. This project is to adapt an innovative photolytic paint stripper to cleaning insulators for the third rail. The overall objective is to de ...

    SBIR Phase I 2008 Department of Transportation
  6. Quick-release Emergency Egress Panel on Cab Car End Doors

    SBC: TIAX LLC            Topic: 07FR2

    The FRA has identified cab car end door kick panels as possible emergency egress panels. They could be used in circumstances where the convential emergency exits are unusable. The industry has operational and maintenance concerns. The objectives of this SBIR are to define the requirements for end door emergency egress panels and identify alternative design approaches and assess their effectiven ...

    SBIR Phase I 2008 Department of Transportation
  7. Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials

    SBC: Integran Technologies U.S.A. Inc.            Topic: 07PH1

    This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...

    SBIR Phase I 2008 Department of Transportation
  8. Multi-Point Optical Sensor-Based Roof Measurement System for Use in Dynamic Rollover Testing

    SBC: Boxboro Systems LLC            Topic: 07NH2

    An optical, non-contact roof deformation monitoring system will be designed based on an existing multi-point, non-contact, multi-axis optical sensor-based measurement system that is currently used to measure chest deflection in crash-test dummies. The research involves determining suitable components to be used in the optical path, from high-power LED arrays through lenses and optical sensors. T ...

    SBIR Phase I 2008 Department of Transportation
  9. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  10. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation