You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Individualized Fatigue Management Program Technology for Trucking Operations
SBC: PULSAR INFORMATICS, INC. Topic: 091FM1Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...
SBIR Phase I 2009 Department of Transportation -
Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials
SBC: Integran Technologies U.S.A. Inc. Topic: 07PH1This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...
SBIR Phase I 2008 Department of Transportation -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: N/ACities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...
SBIR Phase I 2008 Department of Transportation -
Reducing Traffic Pressure During Hazmat Incidents By Utilizing Situation Awareness Capabilities
SBC: Drakontas LLC Topic: N/AThis proposal responds to DOT topic 081-PH2 "Hazardous Materials (Using Handheld Devices to Assist in Emergency Response to Hazardous Materials Incidents)." The significant innovation in this project involves extending cutting edge tools developed to enhance situation awareness among first responders with appropriate hazmat and traffic information to create a framework for interperting traffic re ...
SBIR Phase I 2008 Department of Transportation -
Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials
SBC: Integran Technologies U.S.A. Inc. Topic: N/AThis proposal describes the application of a mature nanotechnology-based crack arrest/structural repair technology as a novel in-field pipeline repair tool. The repair would be comprised of a thin layer or sleeve of electrodeposited nancrystalline material applied to the damaged region of the pipe in order to utilize the "crack filling" characteristic of the process. The concept proposed has alr ...
SBIR Phase I 2008 Department of Transportation