You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NDT of Fracture Toughness for Pipeline Steels
SBC: FBS INC Topic: 180PH1NDT of Fracture Toughness for Pipeline Steels 3/16/2018 Ultrasound-based technology to nondestructively determine fracture toughness of pipeline steels will be developed. Fracture toughness is the material parameter that, along with applied loading and flaw geometry, dictates the critical crack size, and therefore controls the flaw size that must be detected during inspections. A major challeng ...
SBIR Phase I 2018 Department of Transportation -
Doppler Wind Temperature Sounder
SBC: BRANDYWINE PHOTONICS LLC Topic: 8212TECHNICAL ABSTRACT: We propose developing a new observational capability for measuring upper atmosphere (20-Km to 200-Km+ altitude) wind and temperature dynamics, based on Doppler imaging of Limb concentrations of NO, N2O, and CO2 called the Doppler Wind Temperature Sounder. The principle of operation is that by measuring the Doppler shift of trace gases created by the differential velocity betwee ...
SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration -
Individualized Fatigue Management Program Technology for Trucking Operations
SBC: PULSAR INFORMATICS, INC. Topic: 091FM1Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...
SBIR Phase I 2009 Department of Transportation -
Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials
SBC: Integran Technologies U.S.A. Inc. Topic: 07PH1This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...
SBIR Phase I 2008 Department of Transportation -
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: N/ACities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...
SBIR Phase I 2008 Department of Transportation -
FABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS.
SBC: The Cumagna Corpon Topic: N/AFABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS. THESE ELEMENTS ARE EXPECTEDTO BE EXTREMELY STRONG, ONE-FOURTH THE DENSITY OF STEEL, ANDTO PERMIT CONSIDERABLE SAVINGS IN THE COST OF ERECTION, MAINTENANCE, AND REPLACEMENT OF BRIDGES, ETC. PHASE I WILL PRODUCE, TEST, AND ANALYZE I-BEAMS FABRICATED FROM SEVERAL MAGNAWEAVE CONSTRUCTIONS (WEAVE GEOMETRIES); TH ...
SBIR Phase I 1983 Department of Transportation -
Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials
SBC: Integran Technologies U.S.A. Inc. Topic: N/AThis proposal describes the application of a mature nanotechnology-based crack arrest/structural repair technology as a novel in-field pipeline repair tool. The repair would be comprised of a thin layer or sleeve of electrodeposited nancrystalline material applied to the damaged region of the pipe in order to utilize the "crack filling" characteristic of the process. The concept proposed has alr ...
SBIR Phase I 2008 Department of Transportation