You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Environmental Pavement Monitor
SBC: AVS US INC Topic: 07FH3With infrastructure costs escalating it is becoming essential to monitor the health of asphalt and concrete pavement so that timely maintenance can maximize their usefulness. This SBIR will develop a sensor that can be embedded within concrete or asphalt, which can measure moisture, temperature, stress and strain. It will provide critical data for evaluating pavement performance starting with th ...
SBIR Phase II 2009 Department of Transportation -
Individualized Fatigue Management Program Technology for Trucking Operations
SBC: PULSAR INFORMATICS, INC. Topic: 091FM1Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...
SBIR Phase I 2009 Department of Transportation -
Concrete Environmental Monitoring Sensor
SBC: AVS US INC Topic: 07FH3With infrastructure costs escalating it is becoming essential to monitor the health of concrete structures so that timely maintenance can maximize their useful lives. This SBIR will demonstrate the feasibility of using a passive sensor, embedded within concrete, to measure mositure, temperature, pH and concentrations of chlorides. It will provide critical data for evaluating concrete performance s ...
SBIR Phase I 2008 Department of Transportation -
Pedestrain Exposure Measurement Technology Development
SBC: CALSPAN CORPORATION Topic: N/ACalspan Corporation, located in Buffalo, NY is proposing the research and development of the technology and methodolgy that can be used to accurately measure pedestrian exposure. Existing technologies/methodologies will be analyzed, and a technology/methodolgy that focuses on an individual pedestrian's walking history will be specified. Only technologies that are small, lightweight, reliable, an ...
SBIR Phase I 2008 Department of Transportation -
PDA-Based Portable Data Collection System for Commercial Vehicle Inspection
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 02FM1More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...
SBIR Phase II 2008 Department of Transportation -
Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructural Materials
SBC: Integran Technologies U.S.A. Inc. Topic: 07PH1This proposal describes the application of a mature nanotechnology-based crack arrest / structural repair technology as a novel crack arrestor tool for high-strength pipelines. The crack arrestor would comprise a thin layer or sleeve of electrodeposited nanocrystalline material applied to the outside of the pipe either in the coating mill during fabrication or in-field during or following constru ...
SBIR Phase I 2008 Department of Transportation -
Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials
SBC: Integran Technologies U.S.A. Inc. Topic: N/AThis proposal describes the application of a mature nanotechnology-based crack arrest/structural repair technology as a novel in-field pipeline repair tool. The repair would be comprised of a thin layer or sleeve of electrodeposited nancrystalline material applied to the damaged region of the pipe in order to utilize the "crack filling" characteristic of the process. The concept proposed has alr ...
SBIR Phase I 2008 Department of Transportation -
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
WASH DOTS Invasive Plant Protection Wash Units
SBC: Kennedy, Sheilah A Topic: N/ADevelop strong prevention tool addressing increasing invasive species issues for State DOT construction maintenance departments and projects to easily rapidly efficiently to be used by all State DOT.
SBIR Phase I 2008 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation