You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NDT of Fracture Toughness for Pipeline Steels

    SBC: FBS INC            Topic: 180PH1

    NDT of Fracture Toughness for Pipeline Steels 3/16/2018 Ultrasound-based technology to nondestructively determine fracture toughness of pipeline steels will be developed. Fracture toughness is the material parameter that, along with applied loading and flaw geometry, dictates the critical crack size, and therefore controls the flaw size that must be detected during inspections. A major challeng ...

    SBIR Phase I 2018 Department of Transportation
  2. Doppler Wind Temperature Sounder

    SBC: BRANDYWINE PHOTONICS LLC            Topic: 8212

    TECHNICAL ABSTRACT: We propose developing a new observational capability for measuring upper atmosphere (20-Km to 200-Km+ altitude) wind and temperature dynamics, based on Doppler imaging of Limb concentrations of NO, N2O, and CO2 called the Doppler Wind Temperature Sounder. The principle of operation is that by measuring the Doppler shift of trace gases created by the differential velocity betwee ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...

    SBIR Phase I 2009 Department of Transportation
  4. Low Cost Transverse Rail Defect Detector

    SBC: WavesinSolids LLC            Topic: N/A

    Development of the basic EMAT-based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstrable version of a 2-rail detection system with automated signal interpertation.

    SBIR Phase II 2004 Department of Transportation
US Flag An Official Website of the United States Government