You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
GPU-Based High-Performance Computing for Accelerated Design and Analysis
SBC: EM PHOTONICS INC Topic: SB082024Commodity graphics processing units (GPUs) offer tremendous computational throughput for relatively little cost. They have been shown to outperform microprocessors in the important metrics of FLOPS/dollar, FLOPS/Watt, and FLOPS/unit space and have already been applied to a wide range of numerically intense problems. In Phase I of this project, we demonstrated their potential to enhance complex C ...
SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency -
Multiferroic Approach to Heat Pumps
SBC: Strategic Polymer Sciences, Inc. Topic: SB091001In this SBIR Phase II program, Strategic Polymer Sciences, Inc., teaming up with Prof. Qiming Zhang at Penn State, will further optimize the class of polar-fluoropolymers to meet the operation requirement for the heat pumps used for the microclimate cooling systems for soldier in the battlefield. We will investigate a novel design of a solid-state heat pump which exploits both giant electrocaloric ...
SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: 081FH2City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...
SBIR Phase II 2010 Department of Transportation -
Individualized Fatigue Management Program Technology for Trucking Operations
SBC: PULSAR INFORMATICS, INC. Topic: 091FM1Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...
SBIR Phase I 2009 Department of Transportation -
Strain-Tolerant Organic-Ceramic Coatings for the Passivation of Laser Diode
SBC: ADVANCED COOLING TECHNOLOGIES INC Topic: SB101014This Small Business Innovative Research Phase I project will develop and demonstrate a passivation process that will result in a pin-hole free protective coating for nickel-gold (Ni/Au) plated copper micro-channel coolers (MCC) used for laser diode thermal management. This proposed approach will use atomic layer deposition (ALD) to deposit highly uniform ceramic thin films on commercially availab ...
SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency -
A Handheld Sensor for Amorphous Coating Integrity Evaluation
SBC: ALPHASENSE, INC. Topic: SB093002Under the DARPA sponsored Naval Advanced Amorphous Coating (NAAC) program, a novel, thermal sprayed amorphous metal coating has been developed. Such a coating has demonstrated superior mechanical and corrosion resistance properties. Although the coating is designed to be life-of-ship, the application and operational conditions may compromise the integrity of the coating. For example, the applicati ...
SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency -
Path Planner for Dynamic Environments
SBC: Dragonfly Pictures, Inc. Topic: SB082030Despite excellent recent progress in path planning, current state-of-the-art planners are still incapable of operating robustly in environments that are both cluttered and highly dynamic. The challenge is two-fold. First, predicting the trajectories of dynamic obstacles (i.e., cars, humans, aircraft) is very noisy. As a result, to achieve robust execution, perception modules need to provide a rich ...
SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency -
High Density Power Converter Electronics
SBC: QORTEK INC Topic: SB101013The proposed solid-state (non-magnetic) DC-DC converter technology offers the military a completely different approach to converters for ballistics weapon systems that has important advantages over conventional power conditioning for projectile weapons systems. We are proposing to translate this new technology all the way through to demonstrated fuze hardware that includes addressing both risk re ...
SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency -
Object-Accelerated Computational Fabric
SBC: EXOGI LLC Topic: SB072008CPU technology has progressed to a point of diminishing marginal returns in its current direction. The great success of the highly pipelined sequential processor has now become a hindrance to the efficient scalability for the evolutionary escape route of cookie-cutter chip multi-processor (CMP) designs. RISC instruction sets exist because they are easy to decode and pipeline, but they have relativ ...
SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency -
Mashalator
SBC: Bashpole Software, Inc. Topic: SB092007Several concerns currently inflate the time and cost of integrating heterogeneous data resources and impose a barrier to superior knowledge of the urban battlespace: global data standards cannot be imposed across all enterprises’ schemas, specialized expertise is required to map new data sources into existing ontologies, and some data resources are not intranet accessible by default. In this P ...
SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency