You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation
  2. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government